• Codes
  • Features

    Features Overview

    Go to features
    Reference

    Reference.

    A reliable and up-to-date source of codes.
    Research

    Research.

    Rapidly and efficiently calculate project parameters.
    Collaboration

    Collaboration.

    Get everyone on the same page and streamline code research.
    Workflows
    Architects General Contractor Building Official & Plans Examiner Inspectors Owner Subcontractors Code Consultants
  • Pricing
  • Login
  • Sign Up
Sign Up
Login
  • Code Library
  • Features
  • Pricing
  • About
  • Careers
  • Help
  • Contact
  • Terms
  • Privacy
Sign Up
Upgrade to Premium
Code calculators: Code Calculators automatically generates a detailed list of requirements.
REFERENCE
Amendment Styling
Industry-leading search
Suggested code sections
Code diagrams
RESEARCH
Code calculators
Filter by topic
Code compare
Code sheet exports
COLLABORATION
Team projects
Bookmarks
Comments
START 2 WEEK FREE TRIAL
Have an account? Sign in
// CODE SNIPPET

2512.6 Curing and Interval

Building Code 2015 of Utah > 25 Gypsum Board, Gypsum Panel Products and Plaster > 2512 Exterior Plaster > 2512.6 Curing and Interval
JUMP TO FULL CODE CHAPTER
First and second coats of cement plaster shall be applied and moist cured as set forth in ASTM C926 and Table 2512.6.

TABLE 2512.6 CEMENT PLASTERS

COAT MINIMUM PERIOD
MOIST CURING
MINIMUM INTERVAL
BETWEEN COATS
First 48 hoursa 48 hoursb
Second 48 hours 7 daysc
Finish — Note c
  1. The first two coats shall be as required for the first coats of exterior plaster, except that the moist-curing time period between the first and second coats shall be not less than 24 hours. Moist curing shall not be required where job and weather conditions are favorable to the retention of moisture in the cement plaster for the required time period.
  2. Twenty-four-hour minimum interval between coats of interior cement plaster. For alternative method of application, see Section 2512.8.
  3. Finish coat plaster is permitted to be applied to interior cement plaster base coats after a 48-hour period.

Related Code Sections


2512.6 Gypsum Board, Gypsum Panel Products and Plaster, Curing and Interval
PLASTERS COAT MINIMUM PERIOD MOIST CURING MINIMUM INTERVAL BETWEEN COATS First 48 hours a 48 hours b Second 48 hours 7 days c ...
Building Code 2018 of Utah > 25 Gypsum Board, Gypsum Panel Products and Plaster > 2512 Exterior Plaster > 2512.6 Curing and Interval
2512.6 Gypsum Board, Gypsum Panel Products and Plaster, Curing and Interval
PLASTERS COAT MINIMUM PERIOD MOIST CURING MINIMUM INTERVAL BETWEEN COATS First 48 hours a 48 hours b Second 48 ...
Building Code 2015 of Utah > 25 Gypsum Board, Gypsum Panel Products and Plaster > 2512 Exterior Plaster > 2512.6 Curing and Interval
1908.9 Concrete, Curing
During the curing periods specified herein, shotcrete shall be maintained above 40°F (4°C) and in moist condition ...
Building Code 2018 of Utah > 19 Concrete > 1908 Shotcrete > 1908.9 Curing
1908.9 Concrete, Curing
During the curing periods specified herein, shotcrete shall be maintained above 40°F (4°C) and in moist condition ...
Building Code 2015 of Utah > 19 Concrete > 1908 Shotcrete > 1908.9 Curing
R702.2.2.2 Wall Covering, Curing
The finish coat for two-coat cement plaster shall not be applied sooner than 48 hours after application of the first coat. For three-coat cement ...
Residential Code 2015 of Utah > 7 Wall Covering > R702 Interior Covering > R702.2 Interior Plaster > R702.2.2 Cement Plaster > R702.2.2.2 Curing
Help Contact Us Privacy Terms
Code diagrams
Code diagrams
Unpack the code through illustrations and descriptions.
Code Calculators
Code Calculators
Code calculators automatically generate a detailed list of requirements.
Code Compare
Code Compare
Highlight differences between any two building codes.
Shared projects
Shared projects
Projects provide a dedicated space to collaborate on code research.
Search
Search
Don't miss relevant code. Quickly locate sections across your jurisdiction.
Code sheet exports
Code sheet exports
Generate a code sheet that integrates with your drawing set.
UpCodes Premium
Leverage the most sophisticated code compliance platform.
TRY FREE FOR TWO WEEKS VISIT PRICING
UpCodes Premium
Leverage the full code compliance platform.
START 2 WEEK FREE TRIAL LEARN MORE