// CODE SNIPPET
2512.6 Curing and Interval
JUMP TO FULL CODE CHAPTER
First and second coats of cement plaster shall be applied and moist cured as set forth in ASTM C926 and Table 2512.6.
TABLE 2512.6 CEMENT PLASTERS
TABLE 2512.6 CEMENT PLASTERS
COAT | MINIMUM PERIOD MOIST CURING | MINIMUM INTERVAL BETWEEN COATS |
First | 48 hoursa | 48 hoursb |
Second | 48 hours | 7 daysc |
Finish | — | Note c |
- The first two coats shall be as required for the first coats of exterior plaster, except that the moist-curing time period between the first and second coats shall be not less than 24 hours. Moist curing shall not be required where job and weather conditions are favorable to the retention of moisture in the cement plaster for the required time period.
- Twenty-four-hour minimum interval between coats of interior cement plaster. For alternative method of application, see Section 2512.8.
- Finish coat plaster is permitted to be applied to interior cement plaster base coats after a 48-hour period.
Related Code Sections
2512.6 Gypsum Board, Gypsum Panel Products and Plaster, Curing and Interval
PLASTERS COAT MINIMUM PERIOD MOIST CURING MINIMUM INTERVAL BETWEEN COATS First 48 hours a 48 hours b Second 48 hours 7 days c ...
Building Code 2018 of Utah > 25 Gypsum Board, Gypsum Panel Products and Plaster > 2512 Exterior Plaster > 2512.6 Curing and Interval
2512.6 Gypsum Board, Gypsum Panel Products and Plaster, Curing and Interval
PLASTERS COAT MINIMUM PERIOD MOIST CURING MINIMUM INTERVAL BETWEEN COATS First 48 hours a 48 hours b Second 48 ...
Building Code 2015 of Utah > 25 Gypsum Board, Gypsum Panel Products and Plaster > 2512 Exterior Plaster > 2512.6 Curing and Interval
1908.9 Concrete, Curing
During the curing periods specified herein, shotcrete shall be maintained above 40°F (4°C) and in moist condition ...
1908.9 Concrete, Curing
During the curing periods specified herein, shotcrete shall be maintained above 40°F (4°C) and in moist condition ...
R702.2.2.2 Wall Covering, Curing
The finish coat for two-coat cement plaster shall not be applied sooner than 48 hours after application of the first coat. For three-coat cement ...
Residential Code 2015 of Utah > 7 Wall Covering > R702 Interior Covering > R702.2 Interior Plaster > R702.2.2 Cement Plaster > R702.2.2.2 Curing