• Codes
  • Features

    Features Overview

    Go to features
    Reference

    Reference.

    A reliable and up-to-date source of codes.
    Research

    Research.

    Rapidly and efficiently calculate project parameters.
    Collaboration

    Collaboration.

    Get everyone on the same page and streamline code research.
    Workflows
    Architects General Contractor Building Official & Plans Examiner Inspectors Owner Subcontractors Code Consultants
  • Pricing
  • Login
  • Sign Up
Sign Up
Login
  • Code Library
  • Features
  • Pricing
  • About
  • Careers
  • Help
  • Contact
  • Terms
  • Privacy
Sign Up
Upgrade to Premium
Code calculators: Code Calculators automatically generates a detailed list of requirements.
REFERENCE
Amendment Styling
Industry-leading search
Suggested code sections
Code diagrams
RESEARCH
Code calculators
Filter by topic
Code compare
Code sheet exports
COLLABORATION
Team projects
Bookmarks
Comments
START 2 WEEK FREE TRIAL
Have an account? Sign in
// CODE SNIPPET

1908.9 Curing

Building Code 2015 of Utah > 19 Concrete > 1908 Shotcrete > 1908.9 Curing
JUMP TO FULL CODE CHAPTER
During the curing periods specified herein, shotcrete shall be maintained above 40°F (4°C) and in moist condition.

1908.9.1 Initial Curing

Shotcrete shall be kept continuously moist for 24 hours after shotcreting is complete or shall be sealed with an approved curing compound.

1908.9.2 Final Curing

Final curing shall continue for seven days after shotcreting, or for three days if highearly-strength cement is used, or until the specified strength is obtained. Final curing shall consist of the initial curing process or the shotcrete shall be covered with an approved moisture-retaining cover.

1908.9.3 Natural Curing

Natural curing shall not be used in lieu of that specified in this section unless the relative humidity remains at or above 85 percent, and is authorized by the registered design professional and approved by the building official.

Related Code Sections


1908.9 Concrete, Curing
During the curing periods specified herein, shotcrete shall be maintained above 40°F (4°C) and in moist condition ...
Building Code 2018 of Utah > 19 Concrete > 1908 Shotcrete > 1908.9 Curing
1908.9 Concrete, Curing
During the curing periods specified herein, shotcrete shall be maintained above 40°F (4°C) and in moist condition ...
Building Code 2015 of Utah > 19 Concrete > 1908 Shotcrete > 1908.9 Curing
2512.8.2 Gypsum Board, Gypsum Panel Products and Plaster, Curing
Curing of the first coat is permitted to be omitted and the second coat shall be cured as set forth in ASTM C926 and Table 2512.6 ...
Building Code 2018 of Utah > 25 Gypsum Board, Gypsum Panel Products and Plaster > 2512 Exterior Plaster > 2512.8 Alternate Method of Application > 2512.8.2 Curing
2512.8.2 Gypsum Board, Gypsum Panel Products and Plaster, Curing
Curing of the first coat is permitted to be omitted and the second coat shall be cured as set forth in ASTM C926 and Table 2512.6 ...
Building Code 2015 of Utah > 25 Gypsum Board, Gypsum Panel Products and Plaster > 2512 Exterior Plaster > 2512.8 Alternate Method of Application > 2512.8.2 Curing
R702.2.2.2 Wall Covering, Curing
The finish coat for two-coat cement plaster shall not be applied sooner than 48 hours after application of the first coat. For three-coat cement ...
Residential Code 2015 of Utah > 7 Wall Covering > R702 Interior Covering > R702.2 Interior Plaster > R702.2.2 Cement Plaster > R702.2.2.2 Curing
Help Contact Us Privacy Terms
Code sheet exports
Code sheet exports
Generate a code sheet that integrates with your drawing set.
Search
Search
Don't miss relevant code. Quickly locate sections across your jurisdiction.
Code diagrams
Code diagrams
Unpack the code through illustrations and descriptions.
View thousands of relevant UL Certified products and assemblies that help achieve code compliance
View thousands of relevant UL Certified products and assemblies that help achieve code compliance
Access to UL product and system certification information.
Shared projects
Shared projects
Projects provide a dedicated space to collaborate on code research.
Code Calculators
Code Calculators
Code calculators automatically generate a detailed list of requirements.
Code Compare
Code Compare
Highlight differences between any two building codes.
UpCodes Premium
Leverage the most sophisticated code compliance platform.
TRY FREE FOR TWO WEEKS VISIT PRICING
Join the waitlist
We are looking to gauge the level of interest in linking UL product and system certification information alongside related code sections.

Let us know your email and we’ll ping you once it’s ready! Learn more.

Thank you for your interest!

If you’re open to it, we would love to jump on the phone to make sure we’re building this in the best way possible for your workflow. Any insight or advice would be greatly appreciated. We’ve sent you an email with a calendar link to book at time with us.


Cancel
Get Early Access
UpCodes Premium
Leverage the full code compliance platform.
START 2 WEEK FREE TRIAL LEARN MORE