// CODE SNIPPET
3314.10.8 Counterweight Removal
Related Code Sections
3314.10.8 Safeguards During Construction or Demolition, Counterweight Removal
Counterweights shall not be removed from an outrigger beam until the scaffold is disassembled ...
NYC Building Code 2008 > 33 Safeguards During Construction or Demolition > 3314 Scaffolds > 3314.10 Suspended Scaffold > 3314.10.8 Counterweight Removal
3314.10.8 Safeguards During Construction or Demolition, Counterweight Removal
Counterweights shall not be removed from an outrigger beam until the scaffold is disassembled ...
NYC Building Code 2014 > 33 Safeguards During Construction or Demolition > 3314 Scaffolds > 3314.10 Suspended Scaffold > 3314.10.8 Counterweight Removal
3314.10.9 Safeguards During Construction or Demolition, Counterweight Removal
Counterweights shall not be removed from an
outrigger beam until the scaffold is disassembled ...
NYC Building Code 2022 > 33 Safeguards During Construction or Demolition > 3314 Scaffolds > 3314.10 Suspended Scaffold > 3314.10.9 Counterweight Removal
8.7.2.15.2.1 General Requirements,
When weight is added or removed from a counterweighted elevator, the counterbalance prior to the alteration shall be maintained ...
Safety Code for Elevators and Escalators 2013 of New York City > 8 General Requirements > 8.7 Alterations > 8.7.2 Alterations to Electric Elevators > 8.7.2.15 Car Frames and Platforms > 8.7.2.15.2 Increase or Decrease in Deadweight of Car > 8.7.2.15.2.1
2.3.4.2 Electric Elevators,
The counterweight runway shall be permitted to be fully enclosed for the full height, provided that the partitions are removable in sections weighing ...
Safety Code for Elevators and Escalators 2013 of New York City > 2 Electric Elevators > 2.3 Location and Guarding of Counterweights > 2.3.4 Counterweight Runway Enclosures > 2.3.4.2