// CODE SNIPPET
§1-03.4 Correspondence
JUMP TO FULL CODE CHAPTER
The Chair, executive director, or general counsel will sign official correspondence relating to administrative matters or previous Board decisions. The executive director, general counsel, or staff designated by the Chair will sign official correspondence relating to any application.
Related Code Sections
607.4 Water Supply and Distribution, Flow of Hot Water to Fixtures
Fixture fittings, faucets and diverters shall be installed and adjusted so that the flow of hot water from the fittings corresponds to the left-hand ...
NYC Plumbing Code 2008 > 6 Water Supply and Distribution > 607 Hot Water Supply System > 607.4 Flow of Hot Water to Fixtures
607.4 Water Supply and Distribution, Flow of Hot Water to Fixtures
Fixture fittings, faucets and diverters shall be installed and adjusted so that the flow of hot water from the fittings corresponds to the left-hand ...
NYC Plumbing Code 2014 > 6 Water Supply and Distribution > 607 Hot Water Supply System > 607.4 Flow of Hot Water to Fixtures
**§28-320.3.2 Maintenance of Buildings, Building Emissions Limits for Calendar Years 2030 Through 2034
the building emissions intensity limit of 0.00420 tCO 2 e/sf by the corresponding gross floor area (sf);
For spaces classified as occupancy ...
NYC General Admin. Provisions 2014 > 3 Maintenance of Buildings > *320 Building Energy and Emissions Limits > *§28-320.3 Building Emissions Limits > **§28-320.3.2 Building Emissions Limits for Calendar Years 2030 Through 2034
§27-576 Loads, Thermal Forces
an assumed expansion corresponding to a change in temperature of forty degrees F. For exterior exposed frames, arches, or shells regardless of plan ...
1608.10 Structural Design, Thermal Forces
an assumed expansion corresponding to a change in temperature of 40°F (4.44°C). For exterior exposed frames, arches, or shells ...
NYC Building Code 2008 > 16 Structural Design > 1608 Snow Loads and Thermal Loads > 1608.10 Thermal Forces