// CODE SNIPPET
416.3 Coordination of Plans
Go To Full Code Chapter
The owner preparing an emergency preparedness plan for an occupancy in a mixed-occupancy building shall consult the owner responsible for preparing the emergency preparedness plan for each other occupancy within such building with respect to evacuation and in-building relocation procedures, including use of stairwells and elevators and designation of in-building relocation areas and assembly areas.
Related Code Sections
7.4.6 Documentation,
System riser diagrams shall be coordinated with the floor plans and shall include the following information: General arrangement of the system ...
24.14.6.1 Emergency Communications Systems (ECS), General
Occupancy characteristics Anticipated threat Staff capabilities Coordination with the emergency response plan ...
106.5 Administration, Fuel-Gas-Burning Equipment and Fuel-Gas Piping Plans
, layout, size, and listing information for all fuel-gas burning equipment, gas vents, and chimneys, with the riser numbers coordinated with other plans ...
106.5 Administration, Fuel-Gas-Burning Appliance and Fuel-Gas Piping Plans
for all fuel-gas burning appliances, gas vents, and chimneys, with the riser numbers coordinated with other plans and diagrams. The floor plans shall ...
107.5 Administration, Fuel-Gas-Burning Appliance and Fuel-Gas Piping Plans
vents, and chimneys, with the riser numbers coordinated with other plans and diagrams. The floor plans shall indicate locations of meters and shutoff ...