• Codes
  • Features

    Features Overview

    Go to features
    Reference

    Reference.

    A reliable and up-to-date source of codes.
    Research

    Research.

    Rapidly and efficiently calculate project parameters.
    Collaboration

    Collaboration.

    Get everyone on the same page and streamline code research.
    Workflows
    Architects
    Architects
    General Contractors
    General Contractors
    Building Official & Plans Examiners
    Building Official & Plans Examiners
    Inspectors
    Inspectors
    Owners
    Owners
    Subcontractors
    Subcontractors
    Code Consultants
    Code Consultants
  • Pricing
  • Login
  • Sign Up
Sign Up
Login
  • Code Library
  • Features
  • Pricing
  • About
  • Careers
  • Help
  • Contact
  • Terms
  • Privacy
Sign Up
Upgrade to Premium
Code calculators: Code Calculators automatically generates a detailed list of requirements.
REFERENCE
Amendment Styling
Industry-leading search
Code diagrams
RESEARCH
Code calculators
Filter by topic
Code compare
Code sheet exports
COLLABORATION
Team projects
Bookmarks
Comments
START 2 WEEK FREE TRIAL
Have an account? Sign in
// CODE SNIPPET

1240.4 Coolers and Freezers

California Building Code 2016 (Vol 1 & 2) > 12 Interior Environment > 1240 [AGR] Meat and Poultry Processing Plants > 1240.4 Coolers and Freezers
JUMP TO FULL CODE CHAPTER
Coolers and freezers shall be of adequate size and capacity and have cooling capability to fully enable compliance with the regulations governing the inspection of meat and poultry and meat and poultry products.

Related Code Sections


1240.4 Interior Environment, Coolers and Freezers
Coolers and freezers shall be of adequate size and capacity and have cooling capability to fully enable compliance with the regulations governing ...
California Building Code 2016 (Vol 1 & 2) > 12 Interior Environment > 1240 [AGR] Meat and Poultry Processing Plants > 1240.4 Coolers and Freezers
1240.4 Interior Environment, Coolers and Freezers
Coolers and freezers shall be of adequate size and capacity and have cooling capability to fully enable compliance with the regulations governing ...
California Building Code 2019 (Vol 1 & 2) > 12 Interior Environment > 1240 [AGR] Meat and Poultry Processing Plants > 1240.4 Coolers and Freezers
2603.4.1.2 Plastic, Cooler and Freezer Walls
Foam plastic installed in a maximum thickness of 10 inches (254 mm) in cooler and freezer walls shall: Have a flame spread index of 25 or less ...
California Building Code 2016 (Vol 1 & 2) > 26 Plastic > 2603 Foam Plastic Insulation > 2603.4 Thermal Barrier > 2603.4.1 Thermal Barrier Not Required > 2603.4.1.2 Cooler and Freezer Walls
2603.4.1.2 Plastic, Cooler and Freezer Walls
Foam plastic installed in a maximum thickness of 10 inches (254 mm) in cooler and freezer walls shall: Have a flame spread index of 25 or less ...
California Building Code 2019 (Vol 1 & 2) > 26 Plastic > 2603 Foam Plastic Insulation > 2603.4 Thermal Barrier > 2603.4.1 Thermal Barrier Not Required > 2603.4.1.2 Cooler and Freezer Walls
934.2 Installation of Specific Appliances, Unit Coolers
Factory-built unit coolers for use in refrigerators, freezers, refrigerated warehouses, and walk-in coolers shall comply with UL 412 and installed ...
California Mechanical Code 2019 > 9 Installation of Specific Appliances > 934.0 Refrigeration Appliances > 934.2 Unit Coolers
Help Contact Us Privacy Terms
Shared projects
Shared projects
Projects provide a dedicated space to collaborate on code research.
Code Compare
Code Compare
Highlight differences between any two building codes.
Code diagrams
Code diagrams
Unpack the code through illustrations and descriptions.
Search
Search
Don't miss relevant code. Quickly locate sections across your jurisdiction.
Code sheet exports
Code sheet exports
Generate a code sheet that integrates with your drawing set.
Code Calculators
Code Calculators
Code calculators automatically generate a detailed list of requirements.
UpCodes Premium
Leverage the most sophisticated code compliance platform.
VISIT PRICING
UpCodes Premium
Leverage the full code compliance platform.
START 2 WEEK FREE TRIAL PRICING