• Codes
  • Features

    Features Overview

    Go to features
    Reference

    Reference.

    A reliable and up-to-date source of codes.
    Research

    Research.

    Rapidly and efficiently calculate project parameters.
    Collaboration

    Collaboration.

    Get everyone on the same page and streamline code research.
    Workflows
    Architects
    Architects
    General Contractors
    General Contractors
    Building Official & Plans Examiners
    Building Official & Plans Examiners
    Inspectors
    Inspectors
    Owners
    Owners
    Subcontractors
    Subcontractors
    Code Consultants
    Code Consultants
  • Pricing
  • Login
  • Sign Up
Sign Up
Login
  • Code Library
  • Features
  • Pricing
  • About
  • Careers
  • Help
  • Contact
  • Terms
  • Privacy
Sign Up
Upgrade to Premium
Code calculators: Code Calculators automatically generates a detailed list of requirements.
REFERENCE
Amendment Styling
Industry-leading search
Code diagrams
RESEARCH
Code calculators
Filter by topic
Code compare
Code sheet exports
COLLABORATION
Team projects
Bookmarks
Comments
START 2 WEEK FREE TRIAL
Have an account? Sign in
// CODE SNIPPET

1506.3.2 Construction of Powder Coating Booths

NYC Fire Code 2014 > 15 Flammable Finishes > 1506 Powder Coating > 1506.3 Design and Installation > 1506.3.2 Construction of Powder Coating Booths
JUMP TO FULL CODE CHAPTER
Powder coating booths shall be constructed in accordance with FC1504.3.2, except that booth assemblies listed for such purpose and constructed in accordance with such listing may be constructed of materials other than as required by FC1504.3.2.1.

Related Code Sections


502.7.6 Exhaust Systems, Powder Coating
Exhaust ventilation for powder-coating operations shall be sufficient to maintain the atmosphere below one-half of the minimum explosive ...
NYC Mechanical Code 2008 > 5 Exhaust Systems > 502 Required Systems > 502.7 Application of Flammable Finishes > 502.7.6 Powder Coating
502.7.6 Exhaust Systems, Powder Coating
Exhaust ventilation for powder-coating operations shall be sufficient to maintain the atmosphere below one-half of the minimum explosive ...
NYC Mechanical Code 2014 > 5 Exhaust Systems > 502 Required Systems > 502.7 Application of Flammable Finishes > 502.7.6 Powder Coating
502.7.6 Exhaust Systems, Powder Coating
Exhaust ventilation for powder-coating operations shall be sufficient to maintain the atmosphere below one-half of the minimum explosive ...
NYC Mechanical Code 2022 > 5 Exhaust Systems > 502 Required Systems > 502.7 Application of Flammable Finishes > 502.7.6 Powder Coating
416.4 Special Detailed Requirements Based on Use and Occupancy, Spray Booths
Spray booths shall be designed, constructed and operated in accordance with the New York City Fire Code ...
NYC Building Code 2014 > 4 Special Detailed Requirements Based on Use and Occupancy > 416 Application of Flammable Finishes > 416.4 Spray Booths
416.4 Special Detailed Requirements Based on Use and Occupancy, Spray Booths
Spray booths shall be designed, constructed and operated in accordance with the New York City Fire Code ...
NYC Building Code 2022 > 4 Special Detailed Requirements Based on Use and Occupancy > 416 Application of Flammable Finishes > 416.4 Spray Booths
Help Contact Us Privacy Terms
Code sheet exports
Code sheet exports
Generate a code sheet that integrates with your drawing set.
Code diagrams
Code diagrams
Unpack the code through illustrations and descriptions.
Code Calculators
Code Calculators
Code calculators automatically generate a detailed list of requirements.
Search
Search
Don't miss relevant code. Quickly locate sections across your jurisdiction.
Shared projects
Shared projects
Projects provide a dedicated space to collaborate on code research.
Code Compare
Code Compare
Highlight differences between any two building codes.
UpCodes Premium
Leverage the most sophisticated code compliance platform.
VISIT PRICING
UpCodes Premium
Leverage the full code compliance platform.
START 2 WEEK FREE TRIAL PRICING