// CODE SNIPPET
4.2.0.3 Connection Inspections
JUMP TO FULL CODE CHAPTER
Detailed frame joint evaluations shall be performed in accordance with the procedures in the Interim Guidelines: Evaluation, Repair, Modification and Design of Welded Steel Moment Frame Structures, FEMA 267, August 1995.
Related Code Sections
4.2.0.3 Seismic Evaluation Procedures for Hospital Buildings, Connection Inspections
Detailed frame joint evaluations shall be performed in accordance with the procedures in the Interim Guidelines: Evaluation, Repair, Modification ...
California Administrative Code 2019 > 6 Seismic Evaluation Procedures for Hospital Buildings > 4 Procedures for Moment-Resisting Systems > 4.2 Steel Moment Frames > 4.2.0.3 Connection Inspections
4.2.0.3 Seismic Evaluation Procedures for Hospital Buildings, Connection Inspections
Detailed frame joint evaluations shall be performed in accordance with the procedures in the Interim Guidelines: Evaluation, Repair, Modification ...
California Administrative Code 2022 > 6 Seismic Evaluation Procedures for Hospital Buildings > 4 Procedures for Moment-Resisting Systems > 4.2 Steel Moment Frames > 4.2.0.3 Connection Inspections
4.2.0.3 Seismic Evaluation Procedures for Hospital Buildings, Connection Inspections
Detailed frame joint evaluations shall be performed in accordance with the procedures in the Interim Guidelines: Evaluation, Repair, Modification ...
California Administrative Code 2016 > 6 Seismic Evaluation Procedures for Hospital Buildings > 4 Procedures for Moment-Resisting Systems > 4.2 Steel Moment Frames > 4.2.0.3 Connection Inspections
1501.11.2 Alternate Water Sources for Nonpotable Applications, Cross-Connection Inspection and Testing
system shall be
isolated from each other and independently inspected
and tested to ensure there is no cross-connection in
accordance with Section ...
California Plumbing Code 2016 > 15 Alternate Water Sources for Nonpotable Applications > 1501.0 General > 1501.11 Inspection and Testing > 1501.11.2 Cross-Connection Inspection and Testing
1502.3 Alternate Water Sources for Nonpotable Applications, Cross-Connection Inspection and Testing
An initial visual inspection and initial cross-connection test shall be performed on both the potable and alternate water source systems before ...
California Plumbing Code 2022 > 15 Alternate Water Sources for Nonpotable Applications > 1502.0 Inspection and Testing > 1502.3 Cross-Connection Inspection and Testing