1926.963(f)(2) Conditions to Be Checked
JUMP TO FULL CODE CHAPTER
The test operator in charge shall conduct these routine safety checks before each series of tests and shall verify at least the following conditions:
Barriers and safeguards are in workable condition and placed properly to isolate hazardous areas;
Clearly marked test-power disconnects are readily available in an emergency;
Ground connections are clearly identifiable;
Personal protective equipment is provided and used as required by Subpart E of this part and by this subpart; and
Proper separation between signal, ground, and power cables.
[79 FR 20710-20711, July 10, 2014]
[79 FR 20710-20711, July 10, 2014]
System test status signals, if used, are in operable condition;
Related Code Sections
1926.963(f)(2) Electric Power Transmission and Distribution, Conditions to Be Checked
The test operator in charge shall conduct these routine safety checks before each series of tests and shall verify at least the following conditions ...
OSHA 1926 Construction > V Electric Power Transmission and Distribution > 1926.963 Testing and Test Facilities > 1926.963(f) Safety Check > 1926.963(f)(2) Conditions to Be Checked
1926.963(f)(2)(vi) Electric Power Transmission and Distribution,
Proper separation between signal, ground, and power cables.
[79 FR 20710-20711, July 10, 2014 ...
OSHA 1926 Construction > V Electric Power Transmission and Distribution > 1926.963 Testing and Test Facilities > 1926.963(f) Safety Check > 1926.963(f)(2) Conditions to Be Checked > 1926.963(f)(2)(vi)
1926.963(f) Electric Power Transmission and Distribution, Safety Check
in charge shall conduct these routine safety checks before each series of tests and shall verify at least the following conditions ...
OSHA 1926 Construction > V Electric Power Transmission and Distribution > 1926.963 Testing and Test Facilities > 1926.963(f) Safety Check
1926.964(c)(10) Electric Power Transmission and Distribution, Check Controls
The employer shall ensure that, before employees elevate an aerial lift into the work position, the employees check all controls (ground level ...
OSHA 1926 Construction > V Electric Power Transmission and Distribution > 1926.964 Overhead Lines and Live-Line Barehand Work > 1926.964(c) Live-Line Barehand Work > 1926.964(c)(10) Check Controls
1926.800(c) Underground Construction, Caissons, Cofferdams, and Compressed Air, Check-in/Check-Out
The employer shall maintain a check-in/check-out procedure that will ensure that above-ground personnel can determine an accurate count of the number ...
OSHA 1926 Construction > S Underground Construction, Caissons, Cofferdams, and Compressed Air > 1926.800 Underground Construction > 1926.800(c) Check-in/Check-Out