• Codes
  • Features

    Features Overview

    Go to features
    Reference

    Reference.

    A reliable and up-to-date source of codes.
    Research

    Research.

    Rapidly and efficiently calculate project parameters.
    Collaboration

    Collaboration.

    Get everyone on the same page and streamline code research.
    Workflows
    Architects
    Architects
    General Contractors
    General Contractors
    Building Official & Plans Examiners
    Building Official & Plans Examiners
    Inspectors
    Inspectors
    Owners
    Owners
    Subcontractors
    Subcontractors
    Code Consultants
    Code Consultants
  • Pricing
  • Login
  • Sign Up
Sign Up
Login
  • Code Library
  • Features
  • Pricing
  • About
  • Careers
  • Help
  • Contact
  • Terms
  • Privacy
Sign Up
Upgrade to Premium
Code calculators: Code Calculators automatically generates a detailed list of requirements.
REFERENCE
Amendment Styling
Industry-leading search
Code diagrams
RESEARCH
Code calculators
Filter by topic
Code compare
Code sheet exports
COLLABORATION
Team projects
Bookmarks
Comments
START 2 WEEK FREE TRIAL
Have an account? Sign in
// CODE SNIPPET

§28-305.4.3 Condition Assessment Requirements

NYC General Admin. Provisions 2014 > 3 Maintenance of Buildings > 305 Retaining Walls, Partition Fences and Other Site Structures > §28-305.4 Maintenance, Inspection and Repair of Retaining Walls > §28-305.4.3 Condition Assessment Requirements
JUMP TO FULL CODE CHAPTER
A condition assessment of a retaining wall shall be conducted at periodic intervals as set forth by rule of the commissioner, but such assessment shall be conducted at least once every 5 years. The commissioner may establish staggered assessment cycles for retaining walls required to comply with this section.

§28-305.4.3.1 Registered Design Professional

The condition assessment shall be conducted on behalf of the owner by or under the direct supervision of a registered design professional with appropriate qualifications as prescribed by the department.

§28-305.4.3.2 Department Rules

The condition assessment shall be conducted in accordance with rules promulgated by the commissioner.

Related Code Sections


*§28-305.4.3 Maintenance of Buildings, Condition Assessment Requirements
A condition assessment of a retaining wall shall be conducted at periodic intervals as set forth by rule of the commissioner, but such assessment ...
NYC General Admin. Provisions 2008 > 3 Maintenance of Buildings > 305 Retaining Walls > *§28-305.4 Maintenance, Inspection and Repair of Retaining Walls > *§28-305.4.3 Condition Assessment Requirements
§28-305.4.3 Maintenance of Buildings, Condition Assessment Requirements
A condition assessment of a retaining wall shall be conducted at periodic intervals as set forth by rule of the commissioner, but such assessment ...
NYC General Admin. Provisions 2014 > 3 Maintenance of Buildings > 305 Retaining Walls, Partition Fences and Other Site Structures > §28-305.4 Maintenance, Inspection and Repair of Retaining Walls > §28-305.4.3 Condition Assessment Requirements
§28-305.4.3 Maintenance of Buildings, Condition Assessment Requirements
A condition assessment of a retaining wall shall be conducted at periodic intervals as set forth by rule of the commissioner, but such assessment ...
NYC General Admin. Provisions 2022 > 3 Maintenance of Buildings > 305 Retaining Walls, Partition Fences and Other Site Structures > §28-305.4 Maintenance, Inspection and Repair of Retaining Walls > §28-305.4.3 Condition Assessment Requirements
§28-305.4.3.1 Maintenance of Buildings, Registered Design Professional
The condition assessment shall be conducted on behalf of the owner by or under the direct supervision of a registered design professional ...
NYC General Admin. Provisions 2022 > 3 Maintenance of Buildings > 305 Retaining Walls, Partition Fences and Other Site Structures > §28-305.4 Maintenance, Inspection and Repair of Retaining Walls > §28-305.4.3 Condition Assessment Requirements > §28-305.4.3.1 Registered Design Professional
§28-323.3 Maintenance of Buildings, Condition Assessment
parking structures shall have an initial condition assessment performed by an approved agency as required herein and by rule. During the initial condition ...
NYC General Admin. Provisions 2022 > 3 Maintenance of Buildings > 323 Periodic Inspection of Parking Structures > §28-323.3 Condition Assessment
Help Contact Us Privacy Terms
Code sheet exports
Code sheet exports
Generate a code sheet that integrates with your drawing set.
Code diagrams
Code diagrams
Unpack the code through illustrations and descriptions.
Code Compare
Code Compare
Highlight differences between any two building codes.
Search
Search
Don't miss relevant code. Quickly locate sections across your jurisdiction.
Shared projects
Shared projects
Projects provide a dedicated space to collaborate on code research.
Code Calculators
Code Calculators
Code calculators automatically generate a detailed list of requirements.
UpCodes Premium
Leverage the most sophisticated code compliance platform.
VISIT PRICING
UpCodes Premium
Leverage the full code compliance platform.
START 2 WEEK FREE TRIAL PRICING