• Codes
  • Features

    Features Overview

    Go to features
    Reference

    Reference.

    A reliable and up-to-date source of codes.
    Research

    Research.

    Rapidly and efficiently calculate project parameters.
    Collaboration

    Collaboration.

    Get everyone on the same page and streamline code research.
    Workflows
    Architects General Contractor Building Official & Plans Examiner Inspectors Owner Subcontractors Code Consultants
  • Pricing
  • Login
  • Sign Up
Sign Up
Login
  • Code Library
  • Features
  • Pricing
  • About
  • Careers
  • Help
  • Contact
  • Terms
  • Privacy
Sign Up
Upgrade to Premium
Code calculators: Code Calculators automatically generates a detailed list of requirements.
REFERENCE
Amendment Styling
Industry-leading search
Suggested code sections
Code diagrams
RESEARCH
Code calculators
Filter by topic
Code compare
Code sheet exports
COLLABORATION
Team projects
Bookmarks
Comments
START 2 WEEK FREE TRIAL
Have an account? Sign in
// CODE SNIPPET

1319.8.5 Conclusion of Test

California Plumbing Code 2016 > 13 Health Care Facilities and Medical Gas and Medical Vacuum Systems > 1319.0 Testing and Inspection > 1319.8 Standing Pressure Tests - Medical Vacuum Piping Systems > 1319.8.5 Conclusion of Test
JUMP TO FULL CODE CHAPTER
At the conclusion of the test, there shall not be a change in the vacuum except that attributed to changes in ambient temperature. [NFPA 99:5.1.12.2.7.5]

Related Code Sections


1318.10.5 Health Care Facilities and Medical Gas and Medical Vacuum Systems, Conclusion of Test
At the conclusion of the test, there shall be no change in the vacuum other than that attributed to changes in ambient temperature. [NFPA 99 ...
California Plumbing Code 2019 > 13 Health Care Facilities and Medical Gas and Medical Vacuum Systems > 1318.0 Testing and Inspection > 1318.10 Standing Pressure Tests - Medical Vacuum Piping Systems > 1318.10.5 Conclusion of Test
1319.7.5 Health Care Facilities and Medical Gas and Medical Vacuum Systems, Conclusion of Test
At the conclusion of the tests, there shall not be a change in the test pressure except that attributed to changes in ambient temperature. [NFPA 99 ...
California Plumbing Code 2016 > 13 Health Care Facilities and Medical Gas and Medical Vacuum Systems > 1319.0 Testing and Inspection > 1319.7 Standing Pressure Tests - Medical Gas Piping Systems > 1319.7.5 Conclusion of Test
510.6.1 Fire Service Features, Testing and Proof of Compliance
the conclusion of the testing, a report, which shall verify compliance with Section 510.5.3, shall be submitted to the fire code official ...
California Fire Code 2016 > 5 Fire Service Features > 510 Emergency Responder Radio Coverage > 510.6 Maintenance > 510.6.1 Testing and Proof of Compliance
510.6.1 Fire Service Features, Testing and Proof of Compliance
Other active components shall be checked to verify operation within the manufacturer's specifications. At the conclusion of the testing, a report ...
California Fire Code 2019 > 5 Fire Service Features > 510 Emergency Responder Radio Coverage > 510.6 Maintenance > 510.6.1 Testing and Proof of Compliance
12-7A-3.10 Materials and Construction Methods for Exterior Wildfire Exposure, Conditions of Acceptance
Should one of the three replicates fail to meet the Conditions of Acceptance, three additional tests may be run. All of the additional tests must ...
California Referenced Standards Code 2019 > 12-7A Materials and Construction Methods for Exterior Wildfire Exposure > 12-7A-3.10 Conditions of Acceptance
Help Contact Us Privacy Terms
Search
Search
Don't miss relevant code. Quickly locate sections across your jurisdiction.
Shared projects
Shared projects
Projects provide a dedicated space to collaborate on code research.
Code diagrams
Code diagrams
Unpack the code through illustrations and descriptions.
View thousands of relevant UL Certified products and assemblies that help achieve code compliance
View thousands of relevant UL Certified products and assemblies that help achieve code compliance
Access to UL product and system certification information.
Code Compare
Code Compare
Highlight differences between any two building codes.
Code Calculators
Code Calculators
Code calculators automatically generate a detailed list of requirements.
Code sheet exports
Code sheet exports
Generate a code sheet that integrates with your drawing set.
UpCodes Premium
Leverage the most sophisticated code compliance platform.
TRY FREE FOR TWO WEEKS VISIT PRICING
Join the waitlist
We are looking to gauge the level of interest in linking UL product and system certification information alongside related code sections.

Let us know your email and we’ll ping you once it’s ready! Learn more.

Thank you for your interest!

If you’re open to it, we would love to jump on the phone to make sure we’re building this in the best way possible for your workflow. Any insight or advice would be greatly appreciated. We’ve sent you an email with a calendar link to book at time with us.


Cancel
Get Early Access
UpCodes Premium
Leverage the full code compliance platform.
START 2 WEEK FREE TRIAL LEARN MORE