// CODE SNIPPET
302.4 Concealed Piping Inspection
JUMP TO FULL CODE CHAPTER
Piping, including process piping, that is installed in trenches, shall be inspected prior to backfilling.
Related Code Sections
302.4 General Compliance, Concealed Piping Inspection
Piping, including process piping, that is installed in trenches, shall be inspected prior to backfilling ...
Swimming Pool and Spa Code 2015 of Massachusetts > 3 General Compliance > 302 Electrical, Plumbing, Mechanical and Fuel Gas Requirements > 302.4 Concealed Piping Inspection
G2415.20 Fuel Gas, (404.20) Testing of Piping
Before any system of piping is put in service or concealed, it shall be tested to ensure that it is gas tight. Testing, inspection and purging ...
MA State Building Code, 9th ed, Residential Volume > 24 Fuel Gas > G2415 (404) Piping System Installation > G2415.20 (404.20) Testing of Piping
109.3.4 Scope and Administration, Frame Inspection
Framing inspections shall be made after the roof deck or sheathing, framing, fire blocking, and bracing are in place and pipes, chimneys, and vents ...
Existing Building Code of Massachusetts > 1 Scope and Administration > 109 Inspections > 109.3 Required Inspections > 109.3.4 Frame Inspection
110.3.4 Scope and Administration, Frame Inspection
Framing inspections shall be made after the roof deck or sheathing, all framing, fireblocking and bracing are in place and pipes, chimneys ...
MA State Building Code, 8th ed, Base Volume > 1 Scope and Administration > 110 Inspections > 110.3 Required Inspections > 110.3.4 Frame Inspection
110.3.4 Scope and Administration, Frame Inspection
Framing inspections shall be made after the roof deck or sheathing, all framing, fireblocking and bracing are in place and pipes, chimneys ...
MA State Building Code, 9th ed, Base Volume > 1 Scope and Administration > 110 Inspections > 110.3 Required Inspections > 110.3.4 Frame Inspection