// CODE SNIPPET
§28-104.9.4 Compliance With Special Flood Hazard Area Requirements Mandated Within Special Flood Hazard Areas
JUMP TO FULL CODE CHAPTER
Within coastal areas of special flood hazard and areas of special flood hazard, the commissioner shall not approve construction documents for construction or alteration of buildings or structures, including alterations pursuant to section 28-101.4.3, or for any other activity regulated by section G201 of the New York city building code, unless the application complies with the requirements of appendix G of the New York city building code.
Related Code Sections
§28-104.9.4 Administration, Compliance With Special Flood Hazard Area Requirements Mandated Within Special Flood Hazard Areas
Within coastal areas of special flood hazard and areas of special flood hazard, the commissioner shall not approve construction documents ...
NYC General Admin. Provisions 2014 > 1 Administration > 104 Construction Documents > §28-104.9 Coastal Zones and Water-Sensitive Inland Zones > §28-104.9.4 Compliance With Special Flood Hazard Area Requirements Mandated Within Special Flood Hazard Areas
§28-104.9.4 Administration, Compliance With Special Flood Hazard Area Requirements Mandated Within Special Flood Hazard Areas
Within coastal areas of special flood hazard and areas of special flood hazard, the commissioner shall not approve construction documents ...
NYC General Admin. Provisions 2008 > 1 Administration > 104 Construction Documents > *§28-104.9 Coastal Zones and Water-Sensitive Inland Zones > §28-104.9.4 Compliance With Special Flood Hazard Area Requirements Mandated Within Special Flood Hazard Areas
1206.9.1 Hydronic Piping, Flood Hazard
Piping located in areas of special flood hazard shall comply with Appendix G of the New York City Building Code ...
NYC Mechanical Code 2008 > 12 Hydronic Piping > 1206 Piping Installation > 1206.9 Strains and Stresses > 1206.9.1 Flood Hazard
1206.9.1 Hydronic Piping, Flood Hazard
Piping located in areas of special flood hazard shall comply with Appendix G of the New York City Building Code ...
NYC Mechanical Code 2014 > 12 Hydronic Piping > 1206 Piping Installation > 1206.9 Strains and Stresses > 1206.9.1 Flood Hazard
602.4 Duct Systems, Flood Hazard
For structures located in areas of special flood hazard, plenum spaces shall comply with Appendix G of the New York City Building Code ...