• Codes
  • Features

    Features Overview

    Go to features
    Reference

    Reference.

    A reliable and up-to-date source of codes.
    Research

    Research.

    Rapidly and efficiently calculate project parameters.
    Collaboration

    Collaboration.

    Get everyone on the same page and streamline code research.
    Workflows
    Architects General Contractor Building Official & Plans Examiner Inspectors Owner Subcontractors Code Consultants
  • Pricing
  • Login
  • Sign Up
Sign Up
Login
  • Code Library
  • Features
  • Pricing
  • About
  • Careers
  • Help
  • Contact
  • Terms
  • Privacy
Sign Up
Upgrade to Premium
Code calculators: Code Calculators automatically generates a detailed list of requirements.
REFERENCE
Amendment Styling
Industry-leading search
Suggested code sections
Code diagrams
RESEARCH
Code calculators
Filter by topic
Code compare
Code sheet exports
COLLABORATION
Team projects
Bookmarks
Comments
START 2 WEEK FREE TRIAL
Have an account? Sign in
// CODE SNIPPET

1926.1417(o) Compliance With Rated Capacity

OSHA 1926 Construction > CC Cranes & Derricks in Construction > 1926.1417 Operation > 1926.1417(o) Compliance With Rated Capacity
JUMP TO FULL CODE CHAPTER

1926.1417(o)(1)

The equipment must not be operated in excess of its rated capacity.

1926.1417(o)(2)

The operator must not be required to operate the equipment in a manner that would violate paragraph (o)(1) of this section.

1926.1417(o)(3) Load Weight

The operator must verify that the load is within the rated capacity of the equipment by at least one of the following methods:

1926.1417(o)(3)(i)

The weight of the load must be determined from a source recognized by the industry (such as the load's manufacturer), or by a calculation method recognized by the industry (such as calculating a steel beam from measured dimensions and a known per foot weight), or by other equally reliable means. In addition, when requested by the operator, this information must be provided to the operator prior to the lift; or

1926.1417(o)(3)(ii)

The operator must begin hoisting the load to determine, using a load weighing device, load moment indicator, rated capacity indicator, or rated capacity limiter, if it exceeds 75 percent of the maximum rated capacity at the longest radius that will be used during the lift operation. If it does, the operator must not proceed with the lift until he/she verifies the weight of the load in accordance with paragraph (o)(3)(i) of this section.

Related Code Sections


1926.1417(o) Cranes & Derricks in Construction, Compliance With Rated Capacity
The equipment must not be operated in excess of its rated capacity ...
OSHA 1926 Construction > CC Cranes & Derricks in Construction > 1926.1417 Operation > 1926.1417(o) Compliance With Rated Capacity
1926.1441(c) Cranes & Derricks in Construction, Operation--Procedures
; When rated capacities are available at the control station only in electronic form and a failure occurs that makes ...
OSHA 1926 Construction > CC Cranes & Derricks in Construction > 1926.1441 Equipment With a Rated Hoisting/Lifting Capacity of 2,000 Pounds or Less > 1926.1441(c) Operation--Procedures
1926.1417(u) Cranes & Derricks in Construction, Traveling With a Load
person supervises the operation, determines if it is necessary to reduce rated capacity, and makes determinations regarding load position, boom ...
OSHA 1926 Construction > CC Cranes & Derricks in Construction > 1926.1417 Operation > 1926.1417(u) Traveling With a Load
1926.1441(b) Cranes & Derricks in Construction, Assembly/Disassembly
In addition to compliance with § § 1926.1403 (Assembly/disassembly--selection of manufacturer or employer procedures) and 1926.1406 (Assembly ...
OSHA 1926 Construction > CC Cranes & Derricks in Construction > 1926.1441 Equipment With a Rated Hoisting/Lifting Capacity of 2,000 Pounds or Less > 1926.1441(b) Assembly/Disassembly
1926.1441(c)(2) Cranes & Derricks in Construction, Unavailable Operation Procedures
procedures are unavailable, develop, and ensure compliance with, all procedures necessary for the safe operation of the equipment and attachments ...
OSHA 1926 Construction > CC Cranes & Derricks in Construction > 1926.1441 Equipment With a Rated Hoisting/Lifting Capacity of 2,000 Pounds or Less > 1926.1441(c) Operation--Procedures > 1926.1441(c)(2) Unavailable Operation Procedures
Help Contact Us Privacy Terms
Search
Search
Don't miss relevant code. Quickly locate sections across your jurisdiction.
Code diagrams
Code diagrams
Unpack the code through illustrations and descriptions.
Code Compare
Code Compare
Highlight differences between any two building codes.
Shared projects
Shared projects
Projects provide a dedicated space to collaborate on code research.
Code sheet exports
Code sheet exports
Generate a code sheet that integrates with your drawing set.
Code Calculators
Code Calculators
Code calculators automatically generate a detailed list of requirements.
UpCodes Premium
Leverage the most sophisticated code compliance platform.
TRY FREE FOR TWO WEEKS VISIT PRICING
UpCodes Premium
Leverage the full code compliance platform.
START 2 WEEK FREE TRIAL LEARN MORE