// CODE SNIPPET
1.4.4 Compliance Plan Requirements
JUMP TO FULL CODE CHAPTER
Each compliance plan shall contain the following elements:
- An Existing Site/Campus Description;
- A Compliance Plan Description;
- A Compliance Site Plan;
- A Compliance Plan Schedule; and
- An Existing and Planned Buildings Matrix.
If the compliance plan is submitted separately from the seismic evaluation, it will be necessary to resubmit the information as specified in Section 1.3.4.5, of the Nonstructural Evaluation Report.
Provide a comprehensive narrative description of the Compliance Plan, including the projected schedule for compliance.
Provide Compliance Site Plans, indicating the configuration of the facility at the 2008 and 2030 milestones. The plans shall indicate conforming and nonconforming buildings and identify the final configuration of the facility at each milestone, after completion of compliance measures.
Provide a bar graph schedule which describes the schedule for compliance with the SPC and NPC seismic performance categories, indicating the schedule of the following major phases of the plan:
- Obtain a geotechnical report (if necessary);
- Architecture and engineering design/construction document preparation;
- Local approvals;
Office review, approval and permitting;
BUILDING
NAME/
DESIGNATIONBUILDING
TYPE (per
Section 2.2.3)SPC
existingSPC
plannedNPC
existingNPC
planned- Approval of Department of Health Services Licensing and Certification, and any other required licensing;
- Permanent relocation of acute care services to other buildings or facilities (identify services affected);
- Temporary/interim relocation of acute care services to other buildings including the duration of the approved program flexibility plan pursuant to Health and Safety Code Section 1276.05;
- Construction period; and
- Beneficial occupancy.
Provide the following matrix of construction information for each building of the facility under the acute care license, include the Structural Performance Category (SPC) and Nonstructural Performance Category (NPC) for all hospital buildings (see Tables 2.5.3 and 11.1). Identify each building addition separately.
Related Code Sections
1.4.4 Seismic Evaluation Procedures for Hospital Buildings, Compliance Plan Requirements
Each compliance plan shall contain the following elements: An Existing Site/Campus Description; A Compliance Plan Description; A Compliance Site ...
California Administrative Code 2019 > 6 Seismic Evaluation Procedures for Hospital Buildings > 1 Definitions and Requirements > 1.4 Compliance Plans > 1.4.4 Compliance Plan Requirements
1.4.4 Seismic Evaluation Procedures for Hospital Buildings, Compliance Plan Requirements
Each compliance plan shall contain the following elements: An Existing Site/Campus Description; A Compliance Plan Description; A Compliance Site ...
California Administrative Code 2016 > 6 Seismic Evaluation Procedures for Hospital Buildings > 1 Definitions and Requirements > 1.4 Compliance Plans > 1.4.4 Compliance Plan Requirements
1.4.4.4 Seismic Evaluation Procedures for Hospital Buildings, Compliance Plan Schedule
Provide a bar graph schedule which describes the schedule for compliance with the SPC and NPC seismic performance categories, indicating the schedule ...
California Administrative Code 2016 > 6 Seismic Evaluation Procedures for Hospital Buildings > 1 Definitions and Requirements > 1.4 Compliance Plans > 1.4.4 Compliance Plan Requirements > 1.4.4.4 Compliance Plan Schedule
1.4.4.5 Seismic Evaluation Procedures for Hospital Buildings, Existing and Planned Buildings Matrix
Provide the following matrix of construction information for each building of the facility under the acute care license, include the Structural ...
California Administrative Code 2019 > 6 Seismic Evaluation Procedures for Hospital Buildings > 1 Definitions and Requirements > 1.4 Compliance Plans > 1.4.4 Compliance Plan Requirements > 1.4.4.5 Existing and Planned Buildings Matrix
1.4.4.5 Seismic Evaluation Procedures for Hospital Buildings, Existing and Planned Buildings Matrix
Provide the following matrix of construction information for each building of the facility under the acute care license, include the Structural ...
California Administrative Code 2016 > 6 Seismic Evaluation Procedures for Hospital Buildings > 1 Definitions and Requirements > 1.4 Compliance Plans > 1.4.4 Compliance Plan Requirements > 1.4.4.5 Existing and Planned Buildings Matrix