5.2 Compliance Paths
JUMP TO FULL CODE CHAPTER
The building envelope shall comply with Section 5.1, "General"; Section 5.4, "Mandatory Provisions"; Section 5.7, "Submittals"; Section 5.8, "Product Information and Installation Requirements"; and Section 5.9, "Verification, Testing, Commissioning, and Inspection."
The building envelope shall comply with either
- Section 5.5, "Prescriptive Building Envelope Compliance Path," provided that the fenestration area does not exceed the maximum allowed by Section 5.5.4.2, or
- Section 5.6, "Building Envelope Trade-Off Compliance Path."
Related Code Sections
10.2 Other Equipment, Compliance Paths
Other equipment shall comply with Section 10.2.1 and Section 10.2.2 ...
4.2.1 Administration and Enforcement, Compliance Paths
building performance . PNA = proposed renewable energy contribution not allowed for compliance. PBP = proposed building performance ...
2021 Oregon Energy Efficiency Specialty Code (OEESC) > 4 Administration and Enforcement > 4.2 Compliance > 4.2.1 Compliance Paths
5.2 Building Envelope, Compliance Paths
Section 5.5, "Prescriptive Building Envelope Compliance Path," provided that the fenestration area does not exceed the maximum allowed by Section ...
6.2 Heating, Ventilating, and Air Conditioning, Compliance Paths
of the following: Section 6.3, "Simplified Approach Building Compliance Path for HVAC Systems" Exception to 6.2.2(a) When compliance ...
2021 Oregon Energy Efficiency Specialty Code (OEESC) > 6 Heating, Ventilating, and Air Conditioning > 6.2 Compliance Paths
7.2 Service Water Heating, Compliance Paths
" Service water heating systems and equipment shall comply with Section 7.5, "Prescriptive Compliance Path." ...
2021 Oregon Energy Efficiency Specialty Code (OEESC) > 7 Service Water Heating > 7.2 Compliance Paths