// CODE SNIPPET
L 503.2 Compliance Path(s)
Go To Full Code Chapter
Compliance shall be achieved in accordance with the requirements of Section L 503.1, Section L 503.3, Section L 503.4, and Section L 503.5. [ASHRAE 90.1:7.2.1]
L 503.2.1 Energy Cost Budget Method
Projects using the energy cost budget method of ASHRAE 90.1 for demonstrating compliance with the standard shall be in accordance with the requirements of Section L 503.3 in conjunction with the energy cost budget method of ASHRAE 90.1. [ASHRAE 90.1:7.2.2]
Upcodes Diagrams
Related Code Sections
L 503.2 Sustainable Practices, Compliance Path(s)
Compliance shall be achieved in accordance with the requirements of Section L 503.1, Section L 503.3, Section L 503.4, and Section L 503.5. [ASHRAE ...
10.2 Other Equipment, Compliance Paths
Other equipment shall comply with Section 10.2.1 and Section 10.2.2 ...
4.2.1 Administration and Enforcement, Compliance Paths
building performance.
PNA
=
proposed renewable energy contribution not allowed for compliance.
PBP
=
proposed building performance ...
5.2 Building Envelope, Compliance Paths
Section 5.5, "Prescriptive Building Envelope Compliance Path," provided that the fenestration area does not exceed the maximum allowed by Section 5.5.4.2 ...
6.2 Heating, Ventilating, and Air Conditioning, Compliance Paths
of the following: Section 6.3, "Simplified Approach Building Compliance Path for HVAC Systems" Exception to 6.2.2(a) When compliance is shown ...