// CODE SNIPPET
J107.5 Compaction
JUMP TO FULL CODE CHAPTER
All fill material shall be compacted to
90 percent of maximum density as determined by ASTM D
1557, Modified Proctor, in lifts not exceeding 12 inches (305
mm) in depth.
Related Code Sections
J107.5 Grading, Compaction
All fill material shall be compacted to
90 percent of maximum density as determined by ASTM D
1557, Modified Proctor, in lifts not exceeding 12 ...
1803.5.8 Soils and Foundations, Compacted Fill Material
Where shallow foundations will bear on compacted fill material more than 12 inches (305 mm) in depth, a geotechnical investigation shall be conducted ...
2020 Minnesota Building Code > 18 Soils and Foundations > 1803 Geotechnical Investigations > 1803.5 Investigated Conditions > 1803.5.8 Compacted Fill Material
1803.5.8 Soils and Foundations, Compacted Fill Material
Where shallow foundations will bear on compacted fill material more than 12 inches (305 mm) in depth, a geotechnical investigation shall be conducted ...
Minnesota Building Code 2015 > 18 Soils and Foundations > 1803 Geotechnical Investigations > 1803.5 Investigated Conditions > 1803.5.8 Compacted Fill Material
1804.5 Soils and Foundations, Compacted Fill Material
Where shallow foundations will bear on compacted fill material, the compacted fill shall comply with the provisions of an approved geotechnical ...
Minnesota Building Code 2015 > 18 Soils and Foundations > 1804 Excavation, Grading and Fill > 1804.5 Compacted Fill Material
1804.6 Soils and Foundations, Compacted Fill Material
Where shallow foundations will bear on compacted fill material, the compacted fill shall comply with the provisions of an approved geotechnical ...
2020 Minnesota Building Code > 18 Soils and Foundations > 1804 Excavation, Grading and Fill > 1804.6 Compacted Fill Material