• Codes
  • Features

    Features Overview

    Go to features
    Reference

    Reference.

    A reliable and up-to-date source of codes.
    Research

    Research.

    Rapidly and efficiently calculate project parameters.
    Collaboration

    Collaboration.

    Get everyone on the same page and streamline code research.
    Workflows
    Architects General Contractor Building Official & Plans Examiner Inspectors Owner Subcontractors Code Consultants
  • Pricing
  • Login
  • Sign Up
Sign Up
Login
  • Code Library
  • Features
  • Pricing
  • About
  • Careers
  • Help
  • Contact
  • Terms
  • Privacy
Sign Up
Upgrade to Premium
Code calculators: Code Calculators automatically generates a detailed list of requirements.
REFERENCE
Amendment Styling
Industry-leading search
Suggested code sections
Code diagrams
RESEARCH
Code calculators
Filter by topic
Code compare
Code sheet exports
COLLABORATION
Team projects
Bookmarks
Comments
START 2 WEEK FREE TRIAL
Have an account? Sign in
// CODE SNIPPET

§8-01 Commencement of Demolition. [Repealed]

Title 1 ‒ Department of Buildings > 8 Demolition > §8-01 Commencement of Demolition. [Repealed]
JUMP TO FULL CODE CHAPTER
tppn
Linked Resources Available

This section has been clarified by a tppn issued by the Department of Buildings.

Learn more in the Linked Resources panel on the right.
(Repealed eff. 1/4/2016)

Related Code Sections


Section 3306 Safeguards During Construction or Demolition, Demolition
Demolition operations shall not commence until the applicable pedestrian ...
NYC Building Code 2014 > 33 Safeguards During Construction or Demolition > 3306 Demolition
3306.4 Safeguards During Construction or Demolition, Mechanical Demolition
to the commencement of demolition operations.   Unless permitted by the commissioner, mechanical demolition equipment shall not be used where a building ...
NYC Building Code 2008 > 33 Safeguards During Construction or Demolition > 3306 Demolition > 3306.4 Mechanical Demolition
Appendix A Selected Rules of the Department of Buildings [PDF] (page 1)
Damper Devices in Existing Boilers and Furnaces Retrofitting of Vent Damper Devices [REPEALED] Ch. 8 §8-01 Demolition Commencement of Demolition Ch ...
NYC 1968 Code (Vol II) [PDF] > A Selected Rules of the Department of Buildings
§28-113.3.7 Administration, Amendment and Repeal
The commissioner shall have the power to amend or repeal the approval of any material, including materials previously approved by the board ...
NYC General Admin. Provisions 2014 > 1 Administration > 113 Materials > §28-113.3 Approval Procedure > §28-113.3.7 Amendment and Repeal
§28-113.3.7 Administration, Amendment and Repeal
The commissioner shall have the power to amend or repeal the approval of any material, including materials previously approved by the board ...
NYC General Admin. Provisions 2008 > 1 Administration > 113 Materials > §28-113.3 Approval Procedure > §28-113.3.7 Amendment and Repeal
Help Contact Us Privacy Terms
Code Compare
Code Compare
Highlight differences between any two building codes.
Code sheet exports
Code sheet exports
Generate a code sheet that integrates with your drawing set.
Code Calculators
Code Calculators
Code calculators automatically generate a detailed list of requirements.
Shared projects
Shared projects
Projects provide a dedicated space to collaborate on code research.
Search
Search
Don't miss relevant code. Quickly locate sections across your jurisdiction.
Code diagrams
Code diagrams
Unpack the code through illustrations and descriptions.
UpCodes Premium
Leverage the most sophisticated code compliance platform.
TRY FREE FOR TWO WEEKS VISIT PRICING
UpCodes Premium
Leverage the full code compliance platform.
START 2 WEEK FREE TRIAL LEARN MORE