• Codes
  • Features

    Features Overview

    Go to features
    Reference

    Reference.

    A reliable and up-to-date source of codes.
    Research

    Research.

    Rapidly and efficiently calculate project parameters.
    Collaboration

    Collaboration.

    Get everyone on the same page and streamline code research.
    Workflows
    Architects
    Architects
    General Contractors
    General Contractors
    Building Official & Plans Examiners
    Building Official & Plans Examiners
    Inspectors
    Inspectors
    Owners
    Owners
    Subcontractors
    Subcontractors
    Code Consultants
    Code Consultants
  • Pricing
  • Login
  • Sign Up
Sign Up
Login
  • Code Library
  • Features
  • Pricing
  • About
  • Careers
  • Help
  • Contact
  • Terms
  • Privacy
Sign Up
Upgrade to Premium
Code calculators: Code Calculators automatically generates a detailed list of requirements.
REFERENCE
Amendment Styling
Industry-leading search
Code diagrams
RESEARCH
Code calculators
Filter by topic
Code compare
Code sheet exports
COLLABORATION
Team projects
Bookmarks
Comments
START 2 WEEK FREE TRIAL
Have an account? Sign in
// CODE SNIPPET

602.2.1.4 Combustible Electrical Equipment

NYC Mechanical Code 2008 > 6 Duct Systems > 602 Plenums > 602.2 Construction > 602.2.1 Materials Exposed Within Plenums > 602.2.1.4 Combustible Electrical Equipment
JUMP TO FULL CODE CHAPTER
Combustible electrical equipment exposed within a plenum shall have a peak rate of heat release not greater than 100 kilowatts, a peak optical density not greater than 0.50 and an average optical density not greater than 0.15 when tested in accordance with UL 2043. Combustible electrical equipment shall be listed and labeled.

Related Code Sections


602.2.1.4 Duct Systems, Combustible Electrical Equipment
Combustible electrical equipment exposed within a plenum shall have a peak rate of heat release not greater than 100 kilowatts, a peak optical ...
NYC Mechanical Code 2008 > 6 Duct Systems > 602 Plenums > 602.2 Construction > 602.2.1 Materials Exposed Within Plenums > 602.2.1.4 Combustible Electrical Equipment
602.2.1.4 Duct Systems, Electrical Equipment in Plenums
Electrical equipment with combustible enclosures exposed ...
NYC Mechanical Code 2014 > 6 Duct Systems > 602 Plenums > 602.2 Construction > 602.2.1 Materials Within Plenums > 602.2.1.4 Electrical Equipment in Plenums
602.2.1.4 Duct Systems, Electrical Equipment in Plenums
Electrical equipment with combustible enclosures exposed ...
NYC Mechanical Code 2022 > 6 Duct Systems > 602 Plenums > 602.2 Construction > 602.2.1 Materials Within Plenums > 602.2.1.4 Electrical Equipment in Plenums
8.15.11 Installation Requirements, Electrical Equipment
Unless the requirements of 8.15.11.2 are met, sprinkler protection shall be required in electrical equipment rooms ...
Standard for the Installation of Sprinkler Systems 2016 of New York City > 8 Installation Requirements > 8.15 Special Situations > 8.15.11 Electrical Equipment
8.15.11.2 Installation Requirements,
Sprinklers shall not be required in electrical equipment rooms where all of the following conditions are met: The room is dedicated to electrical ...
Standard for the Installation of Sprinkler Systems 2016 of New York City > 8 Installation Requirements > 8.15 Special Situations > 8.15.11 Electrical Equipment > 8.15.11.2
Help Contact Us Privacy Terms
Shared projects
Shared projects
Projects provide a dedicated space to collaborate on code research.
Code sheet exports
Code sheet exports
Generate a code sheet that integrates with your drawing set.
Code Calculators
Code Calculators
Code calculators automatically generate a detailed list of requirements.
Code Compare
Code Compare
Highlight differences between any two building codes.
Search
Search
Don't miss relevant code. Quickly locate sections across your jurisdiction.
Code diagrams
Code diagrams
Unpack the code through illustrations and descriptions.
UpCodes Premium
Leverage the most sophisticated code compliance platform.
TRY FREE FOR TWO WEEKS VISIT PRICING
UpCodes Premium
Leverage the full code compliance platform.
START 2 WEEK FREE TRIAL PRICING