• Codes
  • Features

    Features Overview

    Go to features
    Reference

    Reference.

    A reliable and up-to-date source of codes.
    Research

    Research.

    Rapidly and efficiently calculate project parameters.
    Collaboration

    Collaboration.

    Get everyone on the same page and streamline code research.
    Workflows
    Architects General Contractor Building Official & Plans Examiner Inspectors Owner Subcontractors Code Consultants
  • Pricing
  • Login
  • Sign Up
Sign Up
Login
  • Code Library
  • Features
  • Pricing
  • About
  • Careers
  • Help
  • Contact
  • Terms
  • Privacy
Sign Up
Upgrade to Premium
Code calculators: Code Calculators automatically generates a detailed list of requirements.
REFERENCE
Amendment Styling
Industry-leading search
Suggested code sections
Code diagrams
RESEARCH
Code calculators
Filter by topic
Code compare
Code sheet exports
COLLABORATION
Team projects
Bookmarks
Comments
START 2 WEEK FREE TRIAL
Have an account? Sign in
// CODE SNIPPET

808.3.7 Clearance for Equipment

2015 Michigan Rehabilitation Code > 8 Alterations — Level 2 > 808 Electrical > 808.3 Residential Occupancies > 808.3.7 Clearance for Equipment
JUMP TO FULL CODE CHAPTER
Clearance for electrical service equipment shall be provided in accordance with the NFPA 70.

Related Code Sections


808.3.7 Alterations — Level 2, Clearance for Equipment
Clearance for electrical service equipment shall be provided in accordance with the NFPA 70 ...
2015 Michigan Rehabilitation Code > 8 Alterations — Level 2 > 808 Electrical > 808.3 Residential Occupancies > 808.3.7 Clearance for Equipment
E3405.2 General Requirements, Working Clearances for Energized Equipment and Panelboards
to the 36-inch dimension (914 mm), the work space shall not be less than 30 inches (762 mm) wide in front of the electrical equipment and not less ...
2015 Michigan Residential Code > 34 General Requirements > E3405 Equipment Location and Clearances > E3405.2 Working Clearances for Energized Equipment and Panelboards
AJ501.5.3.5 Existing Building and Structures, Clearance
Clearance for electrical service equipment shall be provided in accordance with Chapters 34 through 43 ...
2015 Michigan Residential Code > J Existing Building and Structures > AJ501 Alterations > AJ501.5 Electrical Equipment and Wiring > AJ501.5.3 Additional Electrical Requirements > AJ501.5.3.5 Clearance
901.8 Fire Protection Systems, Pump and Riser Room Size
for the installation, as defined by the manufacturer, with sufficient working room around the stationary equipment. Clearances around equipment to elements ...
2015 Michigan Building Code > 9 Fire Protection Systems > 901 General > 901.8 Pump and Riser Room Size
Section E4203 Swimming Pools, Equipment Location and Clearances
conductors for all utilization equipment, other than lighting, shall be provided. Each of such means shall be readily accessible and within sight from ...
2015 Michigan Residential Code > 42 Swimming Pools > E4203 Equipment Location and Clearances
Help Contact Us Privacy Terms
Code Compare
Code Compare
Highlight differences between any two building codes.
Code Calculators
Code Calculators
Code calculators automatically generate a detailed list of requirements.
Code diagrams
Code diagrams
Unpack the code through illustrations and descriptions.
Shared projects
Shared projects
Projects provide a dedicated space to collaborate on code research.
View thousands of relevant UL Certified products and assemblies that help achieve code compliance
View thousands of relevant UL Certified products and assemblies that help achieve code compliance
Access to UL product and system certification information.
Code sheet exports
Code sheet exports
Generate a code sheet that integrates with your drawing set.
Search
Search
Don't miss relevant code. Quickly locate sections across your jurisdiction.
UpCodes Premium
Leverage the most sophisticated code compliance platform.
TRY FREE FOR TWO WEEKS VISIT PRICING
Join the waitlist
We are looking to gauge the level of interest in linking UL product and system certification information alongside related code sections.

Let us know your email and we’ll ping you once it’s ready! Learn more.

Thank you for your interest!

If you’re open to it, we would love to jump on the phone to make sure we’re building this in the best way possible for your workflow. Any insight or advice would be greatly appreciated. We’ve sent you an email with a calendar link to book at time with us.


Cancel
Get Early Access
UpCodes Premium
Leverage the full code compliance platform.
START 2 WEEK FREE TRIAL LEARN MORE