There shall be a clear zone of not less than 36 inches (914 mm) between the exterior of the barrier and any permanent structures or equipment such as pumps, filters and heaters that can be used to climb the barrier.

Related Code Sections

305.2.9 General Compliance, Clear Zone
There shall be a clear zone of not less than 36 inches (914 mm) between the exterior of the barrier and any permanent structures or equipment ...
513.5.2 Exhaust Systems, Opening Protection
installed in accordance with the International Building Code. Fixed openings between smoke zones which are protected utilizing the airflow method. In ...
909.5.2 Fire Protection Systems, Opening Protection
Group I-3. Openings between smoke zones with clear ceiling heights of 14 feet (4267 mm) or greater and bank-down capacity of greater than 20 ...
909.5.2 Fire Protection Systems, Opening Protection
zones with clear ceiling heights of 14 feet (4267 mm) or greater and bank-down capacity of greater than 20 minutes as determined by the design fire size ...