• Codes
  • Features

    Features Overview

    Go to features
    Reference

    Reference.

    A reliable and up-to-date source of codes.
    Research

    Research.

    Rapidly and efficiently calculate project parameters.
    Collaboration

    Collaboration.

    Get everyone on the same page and streamline code research.
    Workflows
    Architects General Contractor Building Official & Plans Examiner Inspectors Owner Subcontractors Code Consultants
  • Pricing
  • Login
  • Sign Up
Sign Up
Login
  • Code Library
  • Features
  • Pricing
  • About
  • Careers
  • Help
  • Contact
  • Terms
  • Privacy
Sign Up
Upgrade to Premium
Code calculators: Code Calculators automatically generates a detailed list of requirements.
REFERENCE
Amendment Styling
Industry-leading search
Suggested code sections
Code diagrams
RESEARCH
Code calculators
Filter by topic
Code compare
Code sheet exports
COLLABORATION
Team projects
Bookmarks
Comments
START 2 WEEK FREE TRIAL
Have an account? Sign in
// CODE SNIPPET

1926.1127(i)(3) Cleaning, Replacement, and Disposal

OSHA 1926 Construction > Z Toxic and Hazardous Substances > 1926.1127 Cadmium > 1926.1127(i) Protective Work Clothing and Equipment > 1926.1127(i)(3) Cleaning, Replacement, and Disposal
JUMP TO FULL CODE CHAPTER

1926.1127(i)(3)(i)

The employer shall provide the protective clothing and equipment required by paragraph (i)(1) of this section in a clean and dry condition as often as necessary to maintain its effectiveness, but in any event at least weekly. The employer is responsible for cleaning and laundering the protective clothing and equipment required by this paragraph to maintain its effectiveness and is also responsible for disposing of such clothing and equipment.

1926.1127(i)(3)(iii)

The employer shall prohibit the removal of cadmium from protective clothing and equipment by blowing, shaking, or any other means that disperses cadmium into the air.

1926.1127(i)(3)(iv)

The employer shall assure that any laundering of contaminated clothing or cleaning of contaminated equipment in the workplace is done in a manner that prevents the release of airborne cadmium in excess of the permissible exposure limit prescribed in paragraph (c) of this section.

1926.1127(i)(3)(v)

The employer shall inform any person who launders or cleans protective clothing or equipment contaminated with cadmium of the potentially harmful effects of exposure to cadmium, and that the clothing and equipment should be laundered or cleaned in a manner to effectively prevent the release of airborne cadmium in excess of the PEL.

1926.1127(i)(3)(ii)

The employer also is responsible for repairing or replacing required protective clothing and equipment as needed to maintain its effectiveness. When rips or tears are detected while an employee is working they shall be immediately mended, or the worksuit shall be immediately replaced.

Related Code Sections


1926.1127(i)(3) Toxic and Hazardous Substances, Cleaning, Replacement, and Disposal
The employer shall provide the protective clothing and equipment required by paragraph (i)(1) of this section in a clean and dry condition as often ...
OSHA 1926 Construction > Z Toxic and Hazardous Substances > 1926.1127 Cadmium > 1926.1127(i) Protective Work Clothing and Equipment > 1926.1127(i)(3) Cleaning, Replacement, and Disposal
1926.62(g)(2) Occupational Health and Environmental Controls, Cleaning and Replacement
shall assure that contaminated protective clothing which is to be cleaned, laundered, or disposed of, is placed in a closed container in the change area ...
OSHA 1926 Construction > D Occupational Health and Environmental Controls > 1926.62 Lead > 1926.62(g) Protective Work Clothing and Equipment > 1926.62(g)(2) Cleaning and Replacement
1926.1126(g) Toxic and Hazardous Substances, Protective Work Clothing and Equipment
is removed for laundering, cleaning, maintenance, or disposal, the employer shall ensure that it is stored and transported in sealed, impermeable bags ...
OSHA 1926 Construction > Z Toxic and Hazardous Substances > 1926.1126 Chromium (VI) > 1926.1126(g) Protective Work Clothing and Equipment
1926.65(k)(5) Occupational Health and Environmental Controls, Personal Protective Clothing and Equipment
Protective clothing and equipment shall be decontaminated, cleaned, laundered, maintained or replaced as needed to maintain their effectiveness ...
OSHA 1926 Construction > D Occupational Health and Environmental Controls > 1926.65 Hazardous Waste Operations and Emergency Response > 1926.65(k) Decontamination > 1926.65(k)(5) Personal Protective Clothing and Equipment
1926.65(k) Occupational Health and Environmental Controls, Decontamination
, cleaned, laundered, maintained or replaced as needed to maintain their effectiveness ...
OSHA 1926 Construction > D Occupational Health and Environmental Controls > 1926.65 Hazardous Waste Operations and Emergency Response > 1926.65(k) Decontamination
Help Contact Us Privacy Terms
Code sheet exports
Code sheet exports
Generate a code sheet that integrates with your drawing set.
Shared projects
Shared projects
Projects provide a dedicated space to collaborate on code research.
Code Compare
Code Compare
Highlight differences between any two building codes.
Search
Search
Don't miss relevant code. Quickly locate sections across your jurisdiction.
Code Calculators
Code Calculators
Code calculators automatically generate a detailed list of requirements.
View thousands of relevant UL Certified products and assemblies that help achieve code compliance
View thousands of relevant UL Certified products and assemblies that help achieve code compliance
Access to UL product and system certification information.
Code diagrams
Code diagrams
Unpack the code through illustrations and descriptions.
UpCodes Premium
Leverage the most sophisticated code compliance platform.
TRY FREE FOR TWO WEEKS VISIT PRICING
Join the waitlist
We are looking to gauge the level of interest in linking UL product and system certification information alongside related code sections.

Let us know your email and we’ll ping you once it’s ready! Learn more.

Thank you for your interest!

If you’re open to it, we would love to jump on the phone to make sure we’re building this in the best way possible for your workflow. Any insight or advice would be greatly appreciated. We’ve sent you an email with a calendar link to book at time with us.


Cancel
Get Early Access
UpCodes Premium
Leverage the full code compliance platform.
START 2 WEEK FREE TRIAL LEARN MORE