1103.4.9.2 Chute Intakes
JUMP TO FULL CODE CHAPTER
Chute intakes shall comply with Section 1103.4.9.2.1 or 1103.4.9.2.2.
Where intake to chutes is direct from a corridor, the intake opening shall be equipped with a chute-intake door in accordance with Section 716 of the International Building Code and having a fire protection rating of not less than 1 hour.
Where the intake to chutes is accessed through a chute-intake room, the room shall be enclosed with 1-hour fire-resistance-rated construction. Opening protectives for the intake room shall be in accordance with Section 716 of the International Building Code and have a fire protection rating of not less than 3/4 hour. Opening protective for the chute enclosure shall be in accordance with Section 1103.4.9.1.
Related Code Sections
1103.4.9.2 Construction Requirements for Existing Buildings, Chute Intakes
Chute intakes shall comply with Section 1103.4.9.2.1 or 1103.4.9.2.2 ...
Fire Code 2015 of Alabama > 11 Construction Requirements for Existing Buildings > 1103 Fire Safety Requirements for Existing Buildings > 1103.4 Vertical Openings > 1103.4.9 Waste and Linen Chutes > 1103.4.9.2 Chute Intakes
716.5.9.1.1 Fire and Smoke Protection Features, Chute Intake Door Latching
Chute intake doors shall be positive latching, remaining latched and closed in the event of latch spring failure during a fire emergency ...
Building Code 2015 of Alabama > 7 Fire and Smoke Protection Features > 716 Opening Protectives > 716.5 Fire Door and Shutter Assemblies > 716.5.9 Door Closing > 716.5.9.1 Latch Required > 716.5.9.1.1 Chute Intake Door Latching
903.2.11.2 Fire Protection Systems, Rubbish and Linen Chutes
sprinkler heads installed at alternate floors and at the lowest intake. Where a rubbish chute extends through a building more than one floor below ...
Fire Code 2015 of Alabama > 9 Fire Protection Systems > 903 Automatic Sprinkler Systems > 903.2 Where Required > 903.2.11 Specific Buildings Areas and Hazards > 903.2.11.2 Rubbish and Linen Chutes
903.2.11.2 Fire Protection Systems, Rubbish and Linen Chutes
sprinkler heads installed at alternate floors and at the lowest intake. Where a rubbish chute extends through a building more than one floor below ...
Building Code 2015 of Alabama > 9 Fire Protection Systems > 903 Automatic Sprinkler Systems > 903.2 Where Required > 903.2.11 Specific Building Areas and Hazards > 903.2.11.2 Rubbish and Linen Chutes
1103.4 Construction Requirements for Existing Buildings, Vertical Openings
Where intake to chutes is direct from a corridor , the intake opening shall be equipped with a chute-intake door in accordance with Section ...
Fire Code 2015 of Alabama > 11 Construction Requirements for Existing Buildings > 1103 Fire Safety Requirements for Existing Buildings > 1103.4 Vertical Openings