• Codes
  • Features

    Features Overview

    Go to features
    Reference

    Reference.

    A reliable and up-to-date source of codes.
    Research

    Research.

    Rapidly and efficiently calculate project parameters.
    Collaboration

    Collaboration.

    Get everyone on the same page and streamline code research.
    Workflows
    Architects
    Architects
    General Contractors
    General Contractors
    Building Official & Plans Examiners
    Building Official & Plans Examiners
    Inspectors
    Inspectors
    Owners
    Owners
    Subcontractors
    Subcontractors
    Code Consultants
    Code Consultants
  • Pricing
  • Login
  • Sign Up
Sign Up
Login
  • Code Library
  • Features
  • Pricing
  • About
  • Careers
  • Help
  • Contact
  • Terms
  • Privacy
Sign Up
Upgrade to Premium
Code calculators: Code Calculators automatically generates a detailed list of requirements.
REFERENCE
Amendment Styling
Industry-leading search
Code diagrams
RESEARCH
Code calculators
Filter by topic
Code compare
Code sheet exports
COLLABORATION
Team projects
Bookmarks
Comments
START 2 WEEK FREE TRIAL
Have an account? Sign in
// CODE SNIPPET

§28-101.4.5.1 Changes in Scope of Work

NYC General Admin. Provisions 2014 > 1 Administration > 101 General > §28-101.4 Effective Date > §28-101.4.5 Work That Increases Existing Floor Surface Area of a Prior Code Building by More Than 110 Percent > §28-101.4.5.1 Changes in Scope of Work
JUMP TO FULL CODE CHAPTER
In cases where changes in the scope of work during the course of construction would result in increasing the floor surface area at the completion of construction by more than 110 percent over the amount of existing floor surface area as determined pursuant to section 28-101.4.5, such entire building shall be made to comply with the provisions of this code as if hereafter erected and such work shall be refiled as a new building application in accordance with the provisions of section 28-105.2.
Exception: Work to the extent necessary to relieve an emergency condition may be performed prior to amending plans or obtaining a new permit pursuant to sections 28-105.4.1 and 28-105.12.2.

Related Code Sections


§28-101.4.5.1 Administration, Changes in Scope of Work
In cases where changes in the scope of work during the course of construction would result in increasing the floor surface area ...
NYC General Admin. Provisions 2014 > 1 Administration > 101 General > §28-101.4 Effective Date > §28-101.4.5 Work That Increases Existing Floor Surface Area of a Prior Code Building by More Than 110 Percent > §28-101.4.5.1 Changes in Scope of Work
§28-101.4.5.1 Administration, Changes in Scope of Work
In cases where changes in the scope of work during the course of construction would result in increasing the floor surface area ...
NYC General Admin. Provisions 2022 > 1 Administration > 101 General > §28-101.4 Effective Date > §28-101.4.5 Work That Increases Existing Floor Surface Area of a Prior Code Building by More Than 110 Percent > §28-101.4.5.1 Changes in Scope of Work
*3301.13 Safeguards During Construction or Demolition, Scope
as defined by this code, and any and all documents that set forth the location and entire nature and extent of the work proposed with sufficient clarity ...
NYC Building Code 2014 > 33 Safeguards During Construction or Demolition > 3301 General > *3301.13 Scope
*3301.13 Safeguards During Construction or Demolition, Scope
as defined by this code, and any and all documents that set forth the location and entire nature and extent of the work proposed with sufficient clarity ...
NYC Building Code 2022 > 33 Safeguards During Construction or Demolition > 3301 General > *3301.13 Scope
1103.2.2 Accessibility, Employee Work Areas
the ground or finished floor where the change in elevation is critical to the work operation shall be exempt from all requirements ...
NYC Building Code 2022 > 11 Accessibility > 1103 Scoping Requirements > 1103.2 General Exceptions > 1103.2.2 Employee Work Areas
Help Contact Us Privacy Terms
Code Compare
Code Compare
Highlight differences between any two building codes.
Code sheet exports
Code sheet exports
Generate a code sheet that integrates with your drawing set.
Search
Search
Don't miss relevant code. Quickly locate sections across your jurisdiction.
Code diagrams
Code diagrams
Unpack the code through illustrations and descriptions.
Shared projects
Shared projects
Projects provide a dedicated space to collaborate on code research.
Code Calculators
Code Calculators
Code calculators automatically generate a detailed list of requirements.
UpCodes Premium
Leverage the most sophisticated code compliance platform.
VISIT PRICING
UpCodes Premium
Leverage the full code compliance platform.
START 2 WEEK FREE TRIAL PRICING