• Codes
  • Features

    Features Overview

    Go to features
    Reference

    Reference.

    A reliable and up-to-date source of codes.
    Research

    Research.

    Rapidly and efficiently calculate project parameters.
    Collaboration

    Collaboration.

    Get everyone on the same page and streamline code research.
    Workflows
    Architects
    Architects
    General Contractors
    General Contractors
    Building Official & Plans Examiners
    Building Official & Plans Examiners
    Inspectors
    Inspectors
    Owners
    Owners
    Subcontractors
    Subcontractors
    Code Consultants
    Code Consultants
  • Pricing
  • Login
  • Sign Up
Sign Up
Login
  • Code Library
  • Features
  • Pricing
  • About
  • Careers
  • Help
  • Contact
  • Terms
  • Privacy
Sign Up
Upgrade to Premium
Code calculators: Code Calculators automatically generates a detailed list of requirements.
REFERENCE
Amendment Styling
Industry-leading search
Code diagrams
RESEARCH
Code calculators
Filter by topic
Code compare
Code sheet exports
COLLABORATION
Team projects
Bookmarks
Comments
START 2 WEEK FREE TRIAL
Have an account? Sign in
// CODE SNIPPET

1926.1404(j) Cantilevered Boom Sections

OSHA 1926 Construction > CC Cranes & Derricks in Construction > 1926.1404 Assembly/Disassembly--General Requirements (Applies to All Assembly and Disassembly Operations) > 1926.1404(j) Cantilevered Boom Sections
JUMP TO FULL CODE CHAPTER
Manufacturer limitations on the maximum amount of boom supported only by cantilevering must not be exceeded. Where these are unavailable, a registered professional engineer familiar with the type of equipment involved must determine in writing this limitation, which must not be exceeded.

Related Code Sections


1926.1404(j) Cranes & Derricks in Construction, Cantilevered Boom Sections
Manufacturer limitations on the maximum amount of boom supported only by cantilevering must not be exceeded. Where these are unavailable ...
OSHA 1926 Construction > CC Cranes & Derricks in Construction > 1926.1404 Assembly/Disassembly--General Requirements (Applies to All Assembly and Disassembly Operations) > 1926.1404(j) Cantilevered Boom Sections
1926.1405(d) Cranes & Derricks in Construction,
None of the top pins on boom sections located on the cantilevered portion of the boom being removed (the portion being removed ahead of the pendant ...
OSHA 1926 Construction > CC Cranes & Derricks in Construction > 1926.1405 Disassembly--Additional Requirements for Dismantling of Booms and Jibs (Applies to Both the Use of Manufacturer Procedures and Employer Procedures) > 1926.1405(d)
1926.1433(c) Cranes & Derricks in Construction,
The following applies to equipment with cantilevered booms (such as hydraulic boom cranes): All the tests listed ...
OSHA 1926 Construction > CC Cranes & Derricks in Construction > 1926.1433 Design, Construction and Testing > 1926.1433(c)
1926.6(dd)(19) General,
SAE J1063 (rev. Nov. 1993), Cantilevered Boom Crane Structures-Method of Test, revised Nov. 1993 ("SAE J1063 (Nov. 1993)"), IBR approved ...
OSHA 1926 Construction > A General > 1926.6 Incorporation by Reference > 1926.6(dd) > 1926.6(dd)(19)
1926.1423(b) Cranes & Derricks in Construction, Boom Walkways
Equipment manufactured after November 8, 2011 with lattice booms must be equipped with walkways on the boom(s) if the vertical profile of the boom ...
OSHA 1926 Construction > CC Cranes & Derricks in Construction > 1926.1423 Fall Protection > 1926.1423(b) Boom Walkways
Help Contact Us Privacy Terms
Code Calculators
Code Calculators
Code calculators automatically generate a detailed list of requirements.
Code Compare
Code Compare
Highlight differences between any two building codes.
Code sheet exports
Code sheet exports
Generate a code sheet that integrates with your drawing set.
Code diagrams
Code diagrams
Unpack the code through illustrations and descriptions.
Search
Search
Don't miss relevant code. Quickly locate sections across your jurisdiction.
Shared projects
Shared projects
Projects provide a dedicated space to collaborate on code research.
UpCodes Premium
Leverage the most sophisticated code compliance platform.
VISIT PRICING
UpCodes Premium
Leverage the full code compliance platform.
START 2 WEEK FREE TRIAL PRICING