C402.4.1.2.3 Building Test
JUMP TO FULL CODE CHAPTER
The completed building shall be tested and the air leakage rate of the building envelope shall not exceed 0.40 cfm/ft2 at a pressure differential of 0.3 inches water gauge (2.0 L/s • m2 at 75 Pa) in accordance with ASTM E 779 or an equivalent method approved by the code official.
The completed building shall be tested and the air leakage rate of the building envelope shall not exceed 0.40 cfm/ft2 at a pressure differential of 0.3 inches water gauge (2.0 L/s • m2 at 75 Pa) in accordance with ASTM E 779 or an equivalent method approved by the code official.
Related Code Sections
C402.4.1.2.3 [CE] Commercial Energy Efficiency, Building Test
The completed building shall be tested and the air leakage rate of the building envelope shall not exceed 0.40 cfm/ft 2 at a pressure ...
2014 FBC - Energy Conservation, 5th edition > 4 [CE] Commercial Energy Efficiency > C402 Building Envelope Requirements > C402.4 Air Leakage (Mandatory) > C402.4.1 Air Barriers > C402.4.1.2 Air Barrier Compliance Options > C402.4.1.2.3 Building Test
P2503.4 Plumbing Administration, Building Sewer Testing
The building sewer shall be tested by insertion of a test plug at the point of connection with the public sewer and filling the building sewer ...
2014 FBC - Residential, 5th edition > 25 Plumbing Administration > P2503 Inspection and Tests > P2503.4 Building Sewer Testing
P2503.4 Plumbing Administration, Building Sewer Testing
The building sewer shall be tested by insertion of a test plug at the point of connection with the public sewer, filling the building sewer ...
2017 FBC - Residential, 6th edition > 25 Plumbing Administration > P2503 Inspection and Tests > P2503.4 Building Sewer Testing
P2503.4 Plumbing Administration, Building Sewer Testing
The building sewer shall be tested by insertion of a test plug at the point of connection with the public sewer, filling the building sewer ...
2020 FBC - Residential, 7th edition > 25 Plumbing Administration > P2503 Inspection and Tests > P2503.4 Building Sewer Testing
C301.1 Florida Standard for Mitigation of Radon in Existing Buildings, Test Procedures
Testing shall be conducted according to the procedures in the appropriate sections of EPA 402-R-92-004, Indoor Radon and Radon Decay Product ...
2020 FBC - Building, 7th edition > C Florida Standard for Mitigation of Radon in Existing Buildings > C3 Testing > C301 General > C301.1 Test Procedures