All pile caps supported by piles that penetrate less than ten feet below cutoff level or less than ten feet below ground level shall be braced against lateral movement. Such bracing may consist of connection to other pile caps that encompass piles embedded more than ten feet below those levels. The heads of the piles shall be fixed in the cap. In no case shall more than fifty percent of the piles in the foundation of any building penetrate less than ten feet below cut-off level or less than ten feet below ground level.

Exception: The requirements of this section shall not apply to caisson piles.
1808.7.4.1 Piles Located Near a Lot Line
Where the embedded length of piles located near a lot line would be reduced to less than ten feet by excavation of the adjacent site to a depth of ten feet below the nearest established curb level, the provisions of Section 1808.7.4 shall apply.
Upcodes Diagrams

Related Code Sections

1808.7.4 Soils and Foundations, Bracing of Short Piles
All pile caps supported by piles that penetrate less than ten feet below cutoff level or less than ten feet below ground level shall be braced ...
§27-694 Foundations, Capping and Bracing of Piles
, concrete pile caps shall be designed in accordance with the provisions of reference standard RS 10-3. (b) Bracing of piles. Except for short piles ...
1810.7.4 Soils and Foundations, Bracing of Short Deep Foundations
level shall be braced against lateral movement. Such bracing may consist of connection to other pile caps that encompass deep foundations embedded ...
1814.1.1 Soils and Foundations, Underpinning and Bracing
Where underpinning is used for the support of adjacent structures, the piers, wall piles or footings shall be installed in such manner so ...