1808.7.3 Bracing at Tops of Piles
JUMP TO FULL CODE CHAPTER
Piles shall be braced to provide lateral stability and resist eccentric loads and moments in all directions. Three or more piles connected by a rigid cap shall be considered braced, provided that the piles are located in radial directions from the centroid of the group not less than 60 degrees (1 rad) apart. A two-pile group in a rigid cap shall be considered to be braced along the axis connecting the two piles. Methods used to brace piles shall be subject to the approval of the commissioner.
Piles supporting walls shall be driven alternately in lines spaced at least 1 foot (305 mm) apart and located symmetrically under the center of gravity of the wall load carried, unless effective measures are taken to provide for eccentricity and moments due to lateral forces, or the wall piles are adequately braced. A single row of piles without bracing is permitted for one and two-family dwellings and lightweight construction not exceeding two stories or 35 feet (10 668 mm) in height, provided the centers of the piles are located within the width of the wall.
Piles supporting walls shall be driven alternately in lines spaced at least 1 foot (305 mm) apart and located symmetrically under the center of gravity of the wall load carried, unless effective measures are taken to provide for eccentricity and moments due to lateral forces, or the wall piles are adequately braced. A single row of piles without bracing is permitted for one and two-family dwellings and lightweight construction not exceeding two stories or 35 feet (10 668 mm) in height, provided the centers of the piles are located within the width of the wall.
Related Code Sections
1808.7.3 Soils and Foundations, Bracing at Tops of Piles
Piles shall be braced to provide lateral stability and resist eccentric loads and moments in all directions. Three or more piles connected by a rigid ...
NYC Building Code 2014 > 18 Soils and Foundations > 1808 Deep Foundations > 1808.7 Lateral Support > 1808.7.3 Bracing at Tops of Piles
Article 9 Construction [PDF] (page 9)
o. Bracing of Piles.l. Tops of all piles shall be embedded in caps not less than three inches, and the caps shall extend at least four inches beyond ...
3304.4.1.1 Safeguards During Construction or Demolition, Sheet Piling and Bracing
Sheet piling and bracing used in trench excavations shall be at least equivalent in strength to that specified in Tables 3304.4.1.1(1) and 3304.4.1.1 ...
NYC Building Code 2008 > 33 Safeguards During Construction or Demolition > 3304 Excavation > 3304.4 Protection of Sides of Excavations > 3304.4.1 Shoring and Bracing and Sheeting > 3304.4.1.1 Sheet Piling and Bracing
§27-694 Foundations, Capping and Bracing of Piles
(a) Capping of piles. (1) EMBEDMENT. Tops of all piles shall be embedded at least three inches in concrete caps. Such concrete shall conform ...
NYC 1968 Code (Vol I) > 11 Foundations > 7 Pile Foundations-General Requirements > §27-694 Capping and Bracing of Piles
1814.1.1 Soils and Foundations, Underpinning and Bracing
Where underpinning is used for the support of adjacent structures, the piers, wall piles or footings shall be installed in such manner so ...
NYC Building Code 2008 > 18 Soils and Foundations > 1814 Underpinning > 1814.1 General > 1814.1.1 Underpinning and Bracing