• Codes
  • Features

    Features Overview

    Go to features
    Reference

    Reference.

    A reliable and up-to-date source of codes.
    Research

    Research.

    Rapidly and efficiently calculate project parameters.
    Collaboration

    Collaboration.

    Get everyone on the same page and streamline code research.
    Workflows
    Architects General Contractor Building Official & Plans Examiner Inspectors Owner Subcontractors Code Consultants
  • Pricing
  • Login
  • Sign Up
Sign Up
Login
  • Code Library
  • Features
  • Pricing
  • About
  • Careers
  • Help
  • Contact
  • Terms
  • Privacy
Sign Up
Upgrade to Premium
Code calculators: Code Calculators automatically generates a detailed list of requirements.
REFERENCE
Amendment Styling
Industry-leading search
Suggested code sections
Code diagrams
RESEARCH
Code calculators
Filter by topic
Code compare
Code sheet exports
COLLABORATION
Team projects
Bookmarks
Comments
START 2 WEEK FREE TRIAL
Have an account? Sign in
// CODE SNIPPET

§27-663 Borings

NYC 1968 Code (Vol I) > 11 Foundations > 2 Soil Investigations > §27-663 Borings
JUMP TO FULL CODE CHAPTER
  1. Number. At least one boring shall be made for every twenty-five hundred square feet of building area or fraction thereof and, for buildings supported on piling of such type or capacity that load tests are required, one boring shall be made for every sixteen hundred square feet of building area or fraction thereof except as indicated in paragraphs one through three of this subdivision.
    1. For one- and two-family dwellings (appurtenant structures such as garages, sheds, and porches shall be considered as part of the dwelling):
      1. Buildings supported on footings founded on soil of class 8-65 or better--For contiguous groups of four or more dwellings at least one boring shall be made for every four buildings. For isolated dwellings and for contiguous groups of two or three dwellings, the overall site shall be explored by at least one boring or auger probing or, alternately, the site of each building shall be explored by one test pit carried to a depth of at least eight feet below the level of the bottom of the proposed footings.
      2. Buildings supported on piles or on footings founded in soil strata of class 9-65, or poorer--The site shall be explored by at least one boring for every four buildings in contiguous groups or one boring for each building in the case of isolated dwellings.
    2. For buildings having a plan area in excess of ten thousand square feet and where subsurface conditions as determined from preliminary borings or from borings on neighboring sites consist of uniform deposits of materials of class 1-65, 2-65, 3-65, 6-65, 7-65, or 8-65, subject to the approval of the commissioner, the required borings may be reduced to one for every five thousand square feet of building area or fraction thereof except where the foundation is to be supported on piles.
    3. Where foundations are to rest on rock of class 1-65, 2-65, or 3-65 and such rock is exposed prior to construction over a part or all of the area of the buildings, borings will not be required in those areas where rock is exposed, and the area (within the limits of the building) of the exposed rock surface shall not be included in the area used to compute the required number of borings, provided the following requirements are met:
      1. The presence of defects or the inclination of bedding planes in the rock are of such size and location as to not affect the stability of the foundation.
      2. The foundation is designed for bearing pressures not exceeding those permitted in table 11-2 without increase for embedment.
  2. Location. At least two-thirds of the required number of borings shall be located within the area under the building. Those outside the area shall not be more than twenty-five feet from the limits of the building. Borings shall be uniformly distributed or distributed in accordance with the loading pattern imposed by the building.
  3. Depth.
    1. Unless soil material of class 1-65 through 3-65 is encountered at shallower depth, borings shall extend below the deepest part of the excavation as necessary to satisfy the more restrictive of the following requirements:
      1. Borings shall extend deep enough into nominally satisfactory bearing material to establish its character and thickness, but not less than the following:
        1. Where the soil material is class 5-65--ten feet.
        2. For one and two family residences, two stories or less in height-- fifteen feet.
        3. For other cases-- twenty-five feet.
      2. Borings shall extend to the depth at which the vertical stress caused by the proposed construction is reduced to ten percent or less of the original vertical stress at this depth due to the weight of the overburden, except that where strata of soil materials of class 9-65 or poorer are encountered within this depth, the borings shall penetrate such strata and be carried to a depth that shows penetration continuous of material of class 8-65 or better as required in paragraph a of this subdivision.
      3. In addition to the requirements of paragraphs a and b of this subdivision, at least one boring in every ten thousand square feet of building area, but not less than one boring per building, shall be carried to a depth of one hundred feet below the curb for buildings having an average area load exceeding one thousand psf. The average load shall be computed as the sum of all dead loads and live loads of the building, divided by the area of the building at ground level.
    2. Where rock is encountered in borings within the depths noted in paragraph one the borings shall be cored a minimum of five feet into rock, or farther where necessary or required, to obtain at least a recovery of thirty-five per cent core from five feet of penetration but not to exceed the depth in paragraph one of this subdivision. However, for foundations supported on piles or drilled-in caissons bearing on the rock and having a capacity in excess of eighty tons per unit, the capacity of the rock to support the applied load shall be demonstrated by increasing the length of coring to ten feet.
  4. Types.
    1. SOIL BORINGS. Soil samples shall be recovered at intervals not to exceed five feet and at every change of soil strata. Such samples shall be recovered using a two inch O.D. split spoon sampler having an inside diameter of one and three-eighths inches and a constant internal cross section. The sampler shall be at least twenty-four inches long and shall be tipped with a heat treated, sharp cutting shoe. It shall be straight and sound, with an undistorted cross section. The rods to which the sampler is attached shall be one inch extra heavy pipe or one and five-eighths O.D. drill rods. The sampling tools shall be driven with a one hundred forty pound hammer having a fall of thirty inches. The blows per foot so recorded shall be designated, hereinafter, by the symbol, N. The fall of the hammer shall be a free fall and the energy of impact shall not be mitigated by friction of the hoisting line on the drum, friction of the hammer against its guide, or other similar effects. All samples, except those of rock, shall be preserved in air tight bottles having a capacity of at least eight ounces.
    2. ROCK BORINGS. Where borings are required to penetrate rock they shall be advanced by core drilling, and core samples shall be recovered using a double tube core barrel and diamond bits that provide cores at least one and three-eighths inches in diameter.
  5. Data to be reported. Records of all borings required by the provisions of subdivision (a) of this section shall accompany the application for approval of the foundation plans. Such records shall show, as a minimum, the size of casing and the number of blows per foot required to advance the casing (to the depth that casing is used); the weight of hammer and the distance of fall; a description of the sampler; a description of the drill tools and equipment including, where used, the size of diamond bits and type of core barrels; the number of blows required to drive the sampling spoon for each six inches increment of penetration; the elevation of the ground surface referenced to an established datum; the location and depth of the boring and its relation to the proposed construction; the elevations at which samples were taken; the elevations at which core drilling was started and stopped for each "run"; the elevations of the boundaries of soil strata; percent recovery for each "run" of core drilling; description of the soil strata encountered and geological classification of rock drilled (based on visual examination of cores); any particular, unusual, or special conditions such as loss of water in the earth and rock strata, boulders, cavities, and obstructions, use of special type of samplers, traps, etc.; and the level of ground water together with a description of how and when the ground water level was observed. All abandoned or unsuccessful attempts at borings or rock drilling shall be reported.
  6. Disposition of samples and cores. Soil samples and rock cores shall be retained in an accessible location by the owner, or by the party making application for approval of the foundation plans for a period of one year after the date of issuance of a certificate of occupancy, and shall be available upon reasonable notice for inspection by the commissioner.

Related Code Sections


§27-663 Foundations, Borings
Number. At least one boring shall be made for every twenty-five hundred square feet of building area or fraction thereof and, for buildings ...
NYC 1968 Code (Vol I) > 11 Foundations > 2 Soil Investigations > §27-663 Borings
2308.9.11 Wood, Bored Holes
A hole not greater in diameter than 40 percent of the stud width is permitted to be bored in any wood stud. Bored holes not greater than 60 percent ...
NYC Building Code 2008 > 23 Wood > 2308 Conventional Light-Frame Construction > 2308.9 Wall Framing > 2308.9.11 Bored Holes
2308.9.11 Wood, Bored Holes
A hole not greater in diameter than 40 percent of the stud width is permitted to be bored in any wood stud. Bored holes not greater than 60 percent ...
NYC Building Code 2014 > 23 Wood > 2308 Conventional Light-Frame Construction > 2308.9 Wall Framing > 2308.9.11 Bored Holes
302.3.3 General Regulations, Bored Holes
A hole not greater in diameter than 40 percent of the stud depth is permitted to be bored in any wood stud. Bored holes not greater than 60 percent ...
NYC Mechanical Code 2008 > 3 General Regulations > 302 Protection of Structure > 302.3 Cutting, Notching and Boring in Wood Framing > 302.3.3 Bored Holes
302.3.3 General Regulations, Bored Holes
A hole not greater in diameter than 40 percent of the stud depth is permitted to be bored in any wood stud. Bored holes not greater than 60 percent ...
NYC Mechanical Code 2014 > 3 General Regulations > 302 Protection of Structure > 302.3 Cutting, Notching and Boring in Wood Framing > 302.3.3 Bored Holes
Help Contact Us Privacy Terms
Search
Search
Don't miss relevant code. Quickly locate sections across your jurisdiction.
Code sheet exports
Code sheet exports
Generate a code sheet that integrates with your drawing set.
Code Compare
Code Compare
Highlight differences between any two building codes.
Code diagrams
Code diagrams
Unpack the code through illustrations and descriptions.
View thousands of relevant UL Certified products and assemblies that help achieve code compliance
View thousands of relevant UL Certified products and assemblies that help achieve code compliance
Access to UL product and system certification information.
Code Calculators
Code Calculators
Code calculators automatically generate a detailed list of requirements.
Shared projects
Shared projects
Projects provide a dedicated space to collaborate on code research.
UpCodes Premium
Leverage the most sophisticated code compliance platform.
TRY FREE FOR TWO WEEKS VISIT PRICING
Join the waitlist
We are looking to gauge the level of interest in linking UL product and system certification information alongside related code sections.

Let us know your email and we’ll ping you once it’s ready! Learn more.

Thank you for your interest!

If you’re open to it, we would love to jump on the phone to make sure we’re building this in the best way possible for your workflow. Any insight or advice would be greatly appreciated. We’ve sent you an email with a calendar link to book at time with us.


Cancel
Get Early Access
UpCodes Premium
Leverage the full code compliance platform.
START 2 WEEK FREE TRIAL LEARN MORE