// CODE SNIPPET
Section 1008 Boiler Blowoff/Blowdown Valves
JUMP TO FULL CODE CHAPTER
Every boiler shall be equipped with blowoff/blowdown valve(s). The valve(s) shall be installed in the openings provided on the boiler. The minimum quantity and size of each valve shall be the quantity and size specified by the boiler manufacturer or the quantity and size of the boiler blowoff/blowdown valve opening.
Blowoff/blowdown valves shall discharge to a safe place of disposal. Where discharging to the drainage system, the installation shall conform to the New York City Plumbing Code.
Related Code Sections
Section 1008 Boilers, Water Heaters and Pressure Vessels, Boiler Blowoff/Blowdown Valves
Every boiler shall be equipped with blowoff/blowdown valve(s). The valve(s) shall be installed in the openings provided on the boiler. The minimum ...
NYC Mechanical Code 2008 > 10 Boilers, Water Heaters and Pressure Vessels > 1008 Boiler Blowoff/Blowdown Valves
Section 1008 Boilers, Water Heaters and Pressure Vessels, Boiler Blowoff/Blowdown Valves
Every boiler shall be equipped with blowoff/blowdown valve(s). The valve(s) shall be installed in the openings provided on the boiler. The minimum ...
NYC Mechanical Code 2014 > 10 Boilers, Water Heaters and Pressure Vessels > 1008 Boiler Blowoff/Blowdown Valves
Section 1008 Boilers, Water Heaters and Pressure Vessels, Boiler Blowoff/Blowdown Valves
Every boiler shall be equipped with blowoff/blowdown valve(s). The valve(s) shall be installed in the openings provided on the boiler. The minimum ...
NYC Mechanical Code 2022 > 10 Boilers, Water Heaters and Pressure Vessels > 1008 Boiler Blowoff/Blowdown Valves
1008.2 Boilers, Water Heaters and Pressure Vessels, Discharge
Blowoff/blowdown valves shall discharge to a safe place of disposal. Where discharging to the drainage system, the installation shall conform ...
NYC Mechanical Code 2022 > 10 Boilers, Water Heaters and Pressure Vessels > 1008 Boiler Blowoff/Blowdown Valves > 1008.2 Discharge
1008.3 Boilers, Water Heaters and Pressure Vessels, Maintenance
Blowdown lines shall be inspected annually to verify they are free of deposits
and in good working condition ...
NYC Mechanical Code 2022 > 10 Boilers, Water Heaters and Pressure Vessels > 1008 Boiler Blowoff/Blowdown Valves > 1008.3 Maintenance