UpCodes logo
Go To Full Code Chapter
1910.261(g)(13)(i)
Blow-pit openings preferably shall be on the side of the pit instead of on the top. Openings shall be as small as possible when located on top, and shall be protected in accordance with subpart D of this part.
1910.261(g)(13)(iii)
A signaling device shall be installed in the digester and blow-pit rooms and chip bins to be operated as a warning before and while digesters are being blown.
1910.261(g)(13)(iv)
Blow-pit hoops shall be maintained in a safe condition.
1910.261(g)(13)(ii)
A specially constructed ladder shall be used for access to blow pits, to be constructed so that the door of the blow pit cannot be closed when the ladder is in place; other means shall be provided to prevent the closing of the pit door when anyone is in the pit.

Related Code Sections

1910.261(g)(13) Special Industries, Blow Pits and Blow Tanks
Blow-pit openings preferably shall be on the side of the pit instead of on the top. Openings shall be as small as possible when located on top ...
1910.261(g)(19) Special Industries, Blow Lines
digester lead into one pipe, the cock or valve of the blow line from the tank being inspected or repaired shall be locked or tagged out, or the line shall ...
1910.261(g)(14)(ii) Special Industries,
signals the blow-pit man that the blow is completed. Whenever it becomes necessary to remove the hand plate to clear stock, operators shall wear eye ...