• Codes
  • Features

    Features Overview

    Go to features
    Reference

    Reference.

    A reliable and up-to-date source of codes.
    Research

    Research.

    Rapidly and efficiently calculate project parameters.
    Collaboration

    Collaboration.

    Get everyone on the same page and streamline code research.
    Workflows
    Architects
    Architects
    General Contractors
    General Contractors
    Building Official & Plans Examiners
    Building Official & Plans Examiners
    Inspectors
    Inspectors
    Owners
    Owners
    Subcontractors
    Subcontractors
    Code Consultants
    Code Consultants
  • Pricing
  • Login
  • Sign Up
Sign Up
Login
  • Code Library
  • Features
  • Pricing
  • About
  • Careers
  • Help
  • Contact
  • Terms
  • Privacy
Sign Up
Upgrade to Premium
Code calculators: Code Calculators automatically generates a detailed list of requirements.
REFERENCE
Amendment Styling
Industry-leading search
Code diagrams
RESEARCH
Code calculators
Filter by topic
Code compare
Code sheet exports
COLLABORATION
Team projects
Bookmarks
Comments
START 2 WEEK FREE TRIAL
Have an account? Sign in
// CODE SNIPPET

1910.261(g)(19) Blow Lines

OSHA 1910 General Industry > R Special Industries > 1910.261 Pulp, Paper, and Paperboard Mills > 1910.261(g) Chemical Processes of Making Pulp > 1910.261(g)(19) Blow Lines
JUMP TO FULL CODE CHAPTER

1910.261(g)(19)(i)

[Reserved]

1910.261(g)(19)(iii)

When blow lines from more than one digester lead into one pipe, the cock or valve of the blow line from the tank being inspected or repaired shall be locked or tagged out, or the line shall be disconnected and blocked off.

1910.261(g)(19)(ii)

[Reserved]

Related Code Sections


1910.261(g)(19) Special Industries, Blow Lines
[Reserved] When blow lines from more than one ...
OSHA 1910 General Industry > R Special Industries > 1910.261 Pulp, Paper, and Paperboard Mills > 1910.261(g) Chemical Processes of Making Pulp > 1910.261(g)(19) Blow Lines
1910.261(g)(14) Special Industries, Blowing Digester
, and the hand plate shall not be removed until the digester cook signals the blow-pit man that the blow is completed. Whenever it becomes necessary ...
OSHA 1910 General Industry > R Special Industries > 1910.261 Pulp, Paper, and Paperboard Mills > 1910.261(g) Chemical Processes of Making Pulp > 1910.261(g)(14) Blowing Digester
1910.106(b)(3)(iv)(b) Hazardous Materials, Size of Vents
Each tank shall be vented through piping adequate in size to prevent blow-back of vapor or liquid at the fill opening while the tank is being filled ...
OSHA 1910 General Industry > H Hazardous Materials > 1910.106 Flammable Liquids > 1910.106(b) Tank Storage > 1910.106(b)(3) Installation of Underground Tanks > 1910.106(b)(3)(iv) Vents > 1910.106(b)(3)(iv)(b) Size of Vents
1910.261 Special Industries, Pulp, Paper, and Paperboard Mills
blow lines from more than one digester lead into one pipe, the cock or valve of the blow line from the tank being inspected or repaired ...
OSHA 1910 General Industry > R Special Industries > 1910.261 Pulp, Paper, and Paperboard Mills
1910.1043(g)(1) Toxic and Hazardous Substances,
Compressed air "blow down" cleaning shall be prohibited where alternative means are feasible. Where compressed air is used for cleaning ...
OSHA 1910 General Industry > Z Toxic and Hazardous Substances > 1910.1043 Cotton Dust > 1910.1043(g) Work Practices > 1910.1043(g)(1)
Help Contact Us Privacy Terms
Code Calculators
Code Calculators
Code calculators automatically generate a detailed list of requirements.
Search
Search
Don't miss relevant code. Quickly locate sections across your jurisdiction.
Code sheet exports
Code sheet exports
Generate a code sheet that integrates with your drawing set.
Code Compare
Code Compare
Highlight differences between any two building codes.
Code diagrams
Code diagrams
Unpack the code through illustrations and descriptions.
Shared projects
Shared projects
Projects provide a dedicated space to collaborate on code research.
UpCodes Premium
Leverage the most sophisticated code compliance platform.
VISIT PRICING
UpCodes Premium
Leverage the full code compliance platform.
START 2 WEEK FREE TRIAL PRICING