1926.952(c)(1) At Least One Before Each Day or Shift
JUMP TO FULL CODE CHAPTER
If the work or operations to be performed during the work day or shift are repetitive and similar, at least one job briefing shall be conducted before the start of the first job of each day or shift.
Related Code Sections
1926.952(c)(1) Electric Power Transmission and Distribution, At Least One Before Each Day or Shift
If the work or operations to be performed during the work day or shift are repetitive and similar, at least one job briefing shall be conducted ...
OSHA 1926 Construction > V Electric Power Transmission and Distribution > 1926.952 Job Briefing > 1926.952(c) Number of Briefings > 1926.952(c)(1) At Least One Before Each Day or Shift
1926.1412(d) Cranes & Derricks in Construction, Each Shift
A competent person must begin a visual inspection prior to each shift the equipment will be used, which must be completed before or during that shift ...
OSHA 1926 Construction > CC Cranes & Derricks in Construction > 1926.1412 Inspections > 1926.1412(d) Each Shift
1926.1437(h)(1) Cranes & Derricks in Construction, Shift
For each shift inspection, the means used to secure/attach the equipment to the vessel/flotation device is in proper condition, including wear ...
OSHA 1926 Construction > CC Cranes & Derricks in Construction > 1926.1437 Floating Cranes/Derricks and Land Cranes/Derricks on Barges > 1926.1437(h) Inspections > 1926.1437(h)(1) Shift
1926.800(j)(1)(v)(A) Underground Construction, Caissons, Cofferdams, and Compressed Air,
(s), at least at the beginning and midpoint of each shift, until the concentration of hydrogen sulfide has been less than 5 ppm for 3 consecutive days ...
OSHA 1926 Construction > S Underground Construction, Caissons, Cofferdams, and Compressed Air > 1926.800 Underground Construction > 1926.800(j) Air Quality and Monitoring > 1926.800(j)(1) General > 1926.800(j)(1)(v) > 1926.800(j)(1)(v)(A)
1926.1413(a)(1) Cranes & Derricks in Construction,
A competent person must begin a visual inspection prior to each shift the equipment is used, which must be completed before or during that shift. The ...
OSHA 1926 Construction > CC Cranes & Derricks in Construction > 1926.1413 Wire Rope--Inspection > 1926.1413(a) Shift Inspection > 1926.1413(a)(1)