  • Code Library
  • Features
  • Pricing
  • About
  • Careers
  • Help
  • Contact
  • Terms
  • Privacy
Sign Up
Upgrade to Premium
Code calculators: Code Calculators automatically generates a detailed list of requirements.
REFERENCE
Amendment Styling
Industry-leading search
Suggested code sections
Code diagrams
RESEARCH
Code calculators
Filter by topic
Code compare
Code sheet exports
COLLABORATION
Team projects
Bookmarks
Comments
START 2 WEEK FREE TRIAL
Have an account? Sign in
// CODE SNIPPET

1926.1404 Assembly/Disassembly--General Requirements (Applies to All Assembly and Disassembly Operations)

OSHA 1926 Construction > CC Cranes & Derricks in Construction > 1926.1404 Assembly/Disassembly--General Requirements (Applies to All Assembly and Disassembly Operations)
JUMP TO FULL CODE CHAPTER

1926.1404(a) Supervision--Competent-Qualified Person

1926.1404(a)(1)

Assembly/disassembly must be directed by a person who meets the criteria for both a competent person and a qualified person, or by a competent person who is assisted by one or more qualified persons ("A/D director").

1926.1404(a)(2)

Where the assembly/disassembly is being performed by only one person, that person must meet the criteria for both a competent person and a qualified person. For purposes of this standard, that person is considered the A/D director.

1926.1404(b) Knowledge of Procedures

The A/D director must understand the applicable assembly/disassembly procedures.

1926.1404(c) Review of Procedures

The A/D director must review the applicable assembly/disassembly procedures immediately prior to the commencement of assembly/disassembly unless the A/D director understands the procedures and has applied them to the same type and configuration of equipment (including accessories, if any).

1926.1404(d) Crew Instructions

1926.1404(d)(1)

Before commencing assembly/disassembly operations, the A/D director must ensure that the crew members understand all of the following:

1926.1404(d)(1)(i) Their Tasks

1926.1404(d)(1)(iii)

The hazardous positions/locations that they need to avoid.

1926.1404(d)(1)(ii) The Hazards Associated With Their Tasks

1926.1404(d)(2)

During assembly/disassembly operations, before a crew member takes on a different task, or when adding new personnel during the operations, the requirements in paragraphs (d)(1)(i) through (d)(1)(iii) of this section must be met.

1926.1404(e) Protecting Assembly/Disassembly Crew Members Out of Operator View

1926.1404(e)(1)

Before a crew member goes to a location that is out of view of the operator and is either in, on, or under the equipment, or near the equipment (or load) where the crew member could be injured by movement of the equipment (or load), the crew member must inform the operator that he/she is going to that location.

1926.1404(e)(2)

Where the operator knows that a crew member went to a location covered by paragraph (e)(1) of this section, the operator must not move any part of the equipment (or load) until the operator is informed in accordance with a pre-arranged system of communication that the crew member is in a safe position.

1926.1404(f) Working Under the Boom, Jib or Other Components

1926.1404(f)(1)

When pins (or similar devices) are being removed, employees must not be under the boom, jib, or other components, except where the requirements of paragraph (f)(2) of this section are met.

1926.1404(f)(2) Exception

Where the employer demonstrates that site constraints require one or more employees to be under the boom, jib, or other components when pins (or similar devices) are being removed, the A/D director must implement procedures that minimize the risk of unintended dangerous movement and minimize the duration and extent of exposure under the boom. (See Non-mandatory Appendix B of this subpart for an example.)

1926.1404(g) Capacity Limits

During all phases of assembly/disassembly, rated capacity limits for loads imposed on the equipment, equipment components (including rigging), lifting lugs and equipment accessories, must not be exceeded for the equipment being assembled/disassembled.

1926.1404(h) Addressing Specific Hazards

The A/D director supervising the assembly/disassembly operation must address the hazards associated with the operation, which include:

1926.1404(h)(1) Site and Ground Bearing Conditions

Site and ground conditions must be adequate for safe assembly/disassembly operations and to support the equipment during assembly/disassembly (see § 1926.1402 for ground condition requirements).

1926.1404(h)(2) Blocking Material

The size, amount, condition and method of stacking the blocking must be sufficient to sustain the loads and maintain stability.

1926.1404(h)(3) Proper Location of Blocking

When used to support lattice booms or components, blocking must be appropriately placed to:

1926.1404(h)(3)(i) Protect the Structural Integrity of the Equipment, And

1926.1404(h)(3)(ii) Prevent Dangerous Movement and Collapse

1926.1404(h)(4) Verifying Assist Crane Loads

When using an assist crane, the loads that will be imposed on the assist crane at each phase of assembly/disassembly must be verified in accordance with § 1926.1417(o)(3) before assembly/disassembly begins.

1926.1404(h)(5) Boom and Jib Pick Points

The point(s) of attachment of rigging to a boom (or boom sections or jib or jib sections) must be suitable for preventing structural damage and facilitating safe handling of these components.

1926.1404(h)(6) Center of Gravity

1926.1404(h)(6)(i)

The center of gravity of the load must be identified if that is necessary for the method used for maintaining stability.

1926.1404(h)(6)(ii)

Where there is insufficient information to accurately identify the center of gravity, measures designed to prevent unintended dangerous movement resulting from an inaccurate identification of the center of gravity must be used. (See Non-mandatory Appendix B of this subpart for an example.)

1926.1404(h)(7) Stability Upon Pin Removal

The boom sections, boom suspension systems (such as gantry A-frames and jib struts), and components must be rigged or supported to maintain stability upon the removal of the pins.

1926.1404(h)(8) Snagging

Suspension ropes and pendants must not be allowed to catch on the boom or jib connection pins or cotter pins (including keepers and locking pins).

1926.1404(h)(9) Struck by Counterweights

The potential for unintended movement from inadequately supported counterweights and from hoisting counterweights.

1926.1404(h)(10) Boom Hoist Brake Failure

Each time reliance is to be placed on the boom hoist brake to prevent boom movement during assembly/disassembly, the brake must be tested prior to such reliance to determine if it is sufficient to prevent boom movement. If it is not sufficient, a boom hoist pawl, other locking device/back-up braking device, or another method of preventing dangerous movement of the boom (such as blocking or using an assist crane) from a boom hoist brake failure must be used.

1926.1404(h)(11) Loss of Backward Stability

Backward stability before swinging the upperworks, travel, and when attaching or removing equipment components.

1926.1404(h)(12) Wind Speed and Weather

The effect of wind speed and weather on the equipment.

1926.1404(i) [Reserved]

1926.1404(j) Cantilevered Boom Sections

Manufacturer limitations on the maximum amount of boom supported only by cantilevering must not be exceeded. Where these are unavailable, a registered professional engineer familiar with the type of equipment involved must determine in writing this limitation, which must not be exceeded.

1926.1404(k) Weight of Components

The weight of each of the components must be readily available.

1926.1404(l) [Reserved]

1926.1404(m) Components and Configuration

1926.1404(m)(1)

The selection of components, and configuration of the equipment, that affect the capacity or safe operation of the equipment must be in accordance with:

1926.1404(m)(1)(i)

Manufacturer instructions, prohibitions, limitations, and specifications. Where these are unavailable, a registered professional engineer familiar with the type of equipment involved must approve, in writing, the selection and configuration of components; or

1926.1404(m)(1)(ii)

Approved modifications that meet the requirements of § 1926.1434 (Equipment modifications).

1926.1404(m)(2) Post-Assembly Inspection

Upon completion of assembly, the equipment must be inspected to ensure compliance with paragraph (m)(1) of this section (see § 1926.1412(c) for post-assembly inspection requirements).

1926.1404(n) [Reserved]

1926.1404(o) Shipping Pins

Reusable shipping pins, straps, links, and similar equipment must be removed. Once they are removed they must either be stowed or otherwise stored so that they do not present a falling object hazard.

1926.1404(p) Pile Driving

Equipment used for pile driving must not have a jib attached during pile driving operations.

1926.1404(q) Outriggers and Stabilizers

When the load to be handled and the operating radius require the use of outriggers or stabilizers, or at any time when outriggers or stabilizers are used, all of the following requirements must be met (except as otherwise indicated):

1926.1404(q)(1)

The outriggers or stabilizers must be either fully extended or, if manufacturer procedures permit, deployed as specified in the load chart.

1926.1404(q)(2)

The outriggers must be set to remove the equipment weight from the wheels, except for locomotive cranes (see paragraph (q)(6) of this section for use of outriggers on locomotive cranes). This provision does not apply to stabilizers.

1926.1404(q)(3)

When outrigger floats are used, they must be attached to the outriggers. When stabilizer floats are used, they must be attached to the stabilizers.

1926.1404(q)(4)

Each outrigger or stabilizer must be visible to the operator or to a signal person during extension and setting.

1926.1404(q)(5) Outrigger and Stabilizer Blocking Must:

1926.1404(q)(5)(i)

Meet the requirements in paragraphs (h)(2) and (h)(3) of this section.

1926.1404(q)(5)(ii)

Be placed only under the outrigger or stabilizer float/pad of the jack or, where the outrigger or stabilizer is designed without a jack, under the outer bearing surface of the extended outrigger or stabilizer beam.

1926.1404(q)(6)

For locomotive cranes, when using outriggers or stabilizers to handle loads, the manufacturer's procedures must be followed. When lifting loads without using outriggers or stabilizers, the manufacturer's procedures must be met regarding truck wedges or screws.

1926.1404(r) Rigging

In addition to following the requirements in 29 CFR 1926.251 and other requirements in this and other standards applicable to rigging, when rigging is used for assembly/disassembly, the employer must ensure that:

1926.1404(r)(1) The Rigging Work Is Done by a Qualified Rigger

1926.1404(r)(2)

Synthetic slings are protected from: Abrasive, sharp or acute edges, and configurations that could cause a reduction of the sling's rated capacity, such as distortion or localized compression. Note: Requirements for the protection of wire rope slings are contained in 29 CFR 1926.251(c)(9).

1926.1404(r)(3)

When synthetic slings are used, the synthetic sling manufacturer's instructions, limitations, specifications and recommendations must be followed.

[75 FR 48140, August 9, 2010]

Related Code Sections


1926.1404 Cranes & Derricks in Construction, Assembly/Disassembly--General Requirements (Applies to All Assembly and Disassembly Operations)
procedures immediately prior to the commencement of assembly/disassembly unless the A/D director understands the procedures and has applied them to the same ...
OSHA 1926 Construction > CC Cranes & Derricks in Construction > 1926.1404 Assembly/Disassembly--General Requirements (Applies to All Assembly and Disassembly Operations)
1926.1404(r) Cranes & Derricks in Construction, Rigging
is used for assembly/disassembly, the employer must ensure ...
OSHA 1926 Construction > CC Cranes & Derricks in Construction > 1926.1404 Assembly/Disassembly--General Requirements (Applies to All Assembly and Disassembly Operations) > 1926.1404(r) Rigging
1926.1404(c) Cranes & Derricks in Construction, Review of Procedures
The A/D director must review the applicable assembly/disassembly procedures immediately prior to the commencement of assembly/disassembly unless ...
OSHA 1926 Construction > CC Cranes & Derricks in Construction > 1926.1404 Assembly/Disassembly--General Requirements (Applies to All Assembly and Disassembly Operations) > 1926.1404(c) Review of Procedures
1926.1404(g) Cranes & Derricks in Construction, Capacity Limits
During all phases of assembly/disassembly, rated capacity limits for loads imposed on the equipment, equipment components (including rigging ...
OSHA 1926 Construction > CC Cranes & Derricks in Construction > 1926.1404 Assembly/Disassembly--General Requirements (Applies to All Assembly and Disassembly Operations) > 1926.1404(g) Capacity Limits
1926.1404(f) Cranes & Derricks in Construction, Working Under the Boom, Jib or Other Components
When pins (or similar devices) are being removed, employees must not be under the boom, jib, or other components, except where the requirements ...
OSHA 1926 Construction > CC Cranes & Derricks in Construction > 1926.1404 Assembly/Disassembly--General Requirements (Applies to All Assembly and Disassembly Operations) > 1926.1404(f) Working Under the Boom, Jib or Other Components
Help Contact Us Privacy Terms
Shared projects
Shared projects
Projects provide a dedicated space to collaborate on code research.
Code diagrams
Code diagrams
Unpack the code through illustrations and descriptions.
Code Calculators
Code Calculators
Code calculators automatically generate a detailed list of requirements.
Search
Search
Don't miss relevant code. Quickly locate sections across your jurisdiction.
Code sheet exports
Code sheet exports
Generate a code sheet that integrates with your drawing set.
Code Compare
Code Compare
Highlight differences between any two building codes.
UpCodes Premium
Leverage the most sophisticated code compliance platform.
TRY FREE FOR TWO WEEKS VISIT PRICING
UpCodes Premium
Leverage the full code compliance platform.
START 2 WEEK FREE TRIAL LEARN MORE