• Codes
  • Features

    Features Overview

    Go to features
    Reference

    Reference.

    A reliable and up-to-date source of codes.
    Research

    Research.

    Rapidly and efficiently calculate project parameters.
    Collaboration

    Collaboration.

    Get everyone on the same page and streamline code research.
    Workflows
    Architects General Contractor Building Official & Plans Examiner Inspectors Owner Subcontractors Code Consultants
  • Pricing
  • Login
  • Sign Up
Sign Up
Login
  • Code Library
  • Features
  • Pricing
  • About
  • Careers
  • Help
  • Contact
  • Terms
  • Privacy
Sign Up
Upgrade to Premium
Code calculators: Code Calculators automatically generates a detailed list of requirements.
REFERENCE
Amendment Styling
Industry-leading search
Code diagrams
RESEARCH
Code calculators
Filter by topic
Code compare
Code sheet exports
COLLABORATION
Team projects
Bookmarks
Comments
START 2 WEEK FREE TRIAL
Have an account? Sign in
// CODE SNIPPET

1926.1407(c) Assembly/Disassembly Below Power Lines Prohibited

OSHA 1926 Construction > CC Cranes & Derricks in Construction > 1926.1407 Power Line Safety (Up to 350 KV)--Assembly and Disassembly > 1926.1407(c) Assembly/Disassembly Below Power Lines Prohibited
JUMP TO FULL CODE CHAPTER
No part of a crane/derrick, load line, or load (including rigging and lifting accessories), whether partially or fully assembled, is allowed below a power line unless the employer has confirmed that the utility owner/operator has deenergized and (at the worksite) visibly grounded the power line.

Related Code Sections


1926.1407(c) Cranes & Derricks in Construction, Assembly/Disassembly Below Power Lines Prohibited
No part of a crane/derrick, load line, or load (including rigging and lifting accessories), whether partially or fully assembled, is allowed below ...
OSHA 1926 Construction > CC Cranes & Derricks in Construction > 1926.1407 Power Line Safety (Up to 350 KV)--Assembly and Disassembly > 1926.1407(c) Assembly/Disassembly Below Power Lines Prohibited
1926.1441(b) Cranes & Derricks in Construction, Assembly/Disassembly
In addition to compliance with § § 1926.1403 (Assembly/disassembly--selection of manufacturer or employer procedures) and 1926.1406 (Assembly ...
OSHA 1926 Construction > CC Cranes & Derricks in Construction > 1926.1441 Equipment With a Rated Hoisting/Lifting Capacity of 2,000 Pounds or Less > 1926.1441(b) Assembly/Disassembly
1926.1407(b) Cranes & Derricks in Construction, Preventing Encroachment/Electrocution
: Conduct a planning meeting with the Assembly/Disassembly ...
OSHA 1926 Construction > CC Cranes & Derricks in Construction > 1926.1407 Power Line Safety (Up to 350 KV)--Assembly and Disassembly > 1926.1407(b) Preventing Encroachment/Electrocution
1926.1403 Cranes & Derricks in Construction, Assembly/Disassembly--Selection of Manufacturer or Employer Procedures
When assembling or disassembling equipment (or attachments), the employer must comply with all applicable manufacturer prohibitions and must comply ...
OSHA 1926 Construction > CC Cranes & Derricks in Construction > 1926.1403 Assembly/Disassembly--Selection of Manufacturer or Employer Procedures
1926.1404(m) Cranes & Derricks in Construction, Components and Configuration
with: Manufacturer instructions, prohibitions ...
OSHA 1926 Construction > CC Cranes & Derricks in Construction > 1926.1404 Assembly/Disassembly--General Requirements (Applies to All Assembly and Disassembly Operations) > 1926.1404(m) Components and Configuration
Help Contact Us Privacy Terms
Code Compare
Code Compare
Highlight differences between any two building codes.
Code sheet exports
Code sheet exports
Generate a code sheet that integrates with your drawing set.
Code diagrams
Code diagrams
Unpack the code through illustrations and descriptions.
Code Calculators
Code Calculators
Code calculators automatically generate a detailed list of requirements.
Shared projects
Shared projects
Projects provide a dedicated space to collaborate on code research.
Search
Search
Don't miss relevant code. Quickly locate sections across your jurisdiction.
UpCodes Premium
Leverage the most sophisticated code compliance platform.
TRY FREE FOR TWO WEEKS VISIT PRICING
UpCodes Premium
Leverage the full code compliance platform.
START 2 WEEK FREE TRIAL LEARN MORE