1309.9 Assembling and Heating Brazed Joints
JUMP TO FULL CODE CHAPTER
Tube ends shall be inserted into the socket, either fully or to a mechanically limited depth that is not less than the minimum
cup depth (overlap) specified by ASME B16.50. [NFPA 99:5.1.10.4.6.1]
Where flux is permitted, the joint shall be heated slowly until the flux has liquefied. After flux is liquefied, or where flux is not permitted to be used, the joint shall be heated quickly to the brazing temperature, taking care not to overheat the joint. [NFPA 99:5.1.10.4.6.2, 5.1.10.4.6.3]
Related Code Sections
1309.3.9 Health Care Facilities and Medical Gas and Medical Vacuum Systems, Assembling and Heating Brazed Joints
]
After flux is liquefied, or where flux is not
permitted to be used, the joint shall be heated
quickly to the brazing temperature, taking ...
California Plumbing Code 2016 > 13 Health Care Facilities and Medical Gas and Medical Vacuum Systems > 1309.0 Joints and Connections > 1309.3 Brazed Joints and Fittings > 1309.3.9 Assembling and Heating Brazed Joints
1309.9 Health Care Facilities and Medical Gas and Medical Vacuum Systems, Assembling and Heating Brazed Joints
, the joint shall be heated quickly to the brazing temperature, taking care not to overheat the joint. [NFPA 99:5.1.10.4.6.2, 5.1.10.4.6.3] ...
California Plumbing Code 2019 > 13 Health Care Facilities and Medical Gas and Medical Vacuum Systems > 1309.0 Joints and Connections > 1309.9 Assembling and Heating Brazed Joints
1309.3 Health Care Facilities and Medical Gas and Medical Vacuum Systems, Brazed Joints and Fittings
]
After flux is liquefied, or where flux is not
permitted to be used, the joint shall be heated
quickly to the brazing temperature, taking ...
California Plumbing Code 2016 > 13 Health Care Facilities and Medical Gas and Medical Vacuum Systems > 1309.0 Joints and Connections > 1309.3 Brazed Joints and Fittings
705.3 Sanitary Drainage, Copper or Copper Alloy Pipe (DWV) and Joints
sequence of joint preparation and operation as follows:
measuring and cutting, reaming, cleaning, fluxing,
assembly and support, heating, applying ...
California Plumbing Code 2016 > 7 Sanitary Drainage > 705.0 Joints and Connections > 705.3 Copper or Copper Alloy Pipe (DWV) and Joints
705.3 Sanitary Drainage, Copper or Copper Alloy Pipe (DWV) and Joints
sequence of joint preparation and operation as follows:
measuring and cutting, reaming, cleaning, fluxing,
assembly and support, heating, applying ...
California Plumbing Code 2019 > 7 Sanitary Drainage > 705.0 Joints and Connections > 705.3 Copper or Copper Alloy Pipe (DWV) and Joints