• Codes
  • Features

    Features Overview

    Go to features
    Reference

    Reference.

    A reliable and up-to-date source of codes.
    Research

    Research.

    Rapidly and efficiently calculate project parameters.
    Collaboration

    Collaboration.

    Get everyone on the same page and streamline code research.
    Workflows
    Architects General Contractor Building Official & Plans Examiner Inspectors Owner Subcontractors Code Consultants
  • Pricing
  • Login
  • Sign Up
Sign Up
Login
  • Code Library
  • Features
  • Pricing
  • About
  • Careers
  • Help
  • Contact
  • Terms
  • Privacy
Sign Up
Upgrade to Premium
Code calculators: Code Calculators automatically generates a detailed list of requirements.
REFERENCE
Amendment Styling
Industry-leading search
Suggested code sections
Code diagrams
RESEARCH
Code calculators
Filter by topic
Code compare
Code sheet exports
COLLABORATION
Team projects
Bookmarks
Comments
START 2 WEEK FREE TRIAL
Have an account? Sign in
// CODE SNIPPET

A-302.10.5 Asbestos Inspection Report

Philadelphia Administrative Code > 3 Permits > A-302 Permits > A-302.10 Conditions of Permit > A-302.10.5 Asbestos Inspection Report
JUMP TO FULL CODE CHAPTER
A permit for any demolition or alteration in excess of $50,000 shall not be issued until an asbestos inspection report including all laboratory sample reports and analyses, furnished by an independent certified asbestos investigator as defined in Section 6-601 of the Philadelphia Health Code, has been submitted. Submission of an asbestos inspection report is not required for buildings erected pursuant to a building permit issued after December 31, 1980, or any residence with three dwelling units or less. The Department is responsible for forwarding the submitted asbestos inspection report to the Department of Public Health for review and appropriate action. Notwithstanding this requirement, where asbestos is found, all regulations of the Department of Public Health shall be followed.

UpCodes note: Section A-302.10.5 was amended by Bill No. 130685 (approved February 19, 2014), and Bill No. 180175 (approved June 6, 2018).

Related Code Sections


A-302.10.5 Permits, Asbestos Inspection Report
A permit for any demolition or alteration in excess of $50,000 shall not be issued until an asbestos inspection report including all laboratory ...
Philadelphia Administrative Code > 3 Permits > A-302 Permits > A-302.10 Conditions of Permit > A-302.10.5 Asbestos Inspection Report
3103.7.1 Tents, Temporary Special Event Structures and Other Membrane Structures, Inspection Report
Where required by the fire code official , an inspection report shall be provided and shall consist of maintenance, anchors and fabric inspections ...
2018 Philadelphia Fire Code > 31 Tents, Temporary Special Event Structures and Other Membrane Structures > 3103 Temporary Tents and Membrane Structures > 3103.7 Inspections > 3103.7.1 Inspection Report
3105.6.2 Tents, Temporary Special Event Structures and Other Membrane Structures, Inspection Report
The inspecting agency or individual shall furnish an inspection report to the fire code official . The inspection report shall indicate ...
2018 Philadelphia Fire Code > 31 Tents, Temporary Special Event Structures and Other Membrane Structures > 3105 Temporary Special Event Structures > 3105.6 Inspections > 3105.6.2 Inspection Report
1704.2.4 Special Inspections and Tests, Report Requirement
Approved agencies shall keep records of special inspections and tests. The approved agency shall submit reports of special inspections and tests ...
2018 Philadelphia Building Code > 17 Special Inspections and Tests > 1704 Special Inspections and Tests, Contractor Responsibility and Structural Observation > 1704.2 Special Inspections and Tests > 1704.2.4 Report Requirement
Help Contact Us Privacy Terms
Code Compare
Code Compare
Highlight differences between any two building codes.
View thousands of relevant UL Certified products and assemblies that help achieve code compliance
View thousands of relevant UL Certified products and assemblies that help achieve code compliance
Access to UL product and system certification information.
Shared projects
Shared projects
Projects provide a dedicated space to collaborate on code research.
Code diagrams
Code diagrams
Unpack the code through illustrations and descriptions.
Code sheet exports
Code sheet exports
Generate a code sheet that integrates with your drawing set.
Code Calculators
Code Calculators
Code calculators automatically generate a detailed list of requirements.
Search
Search
Don't miss relevant code. Quickly locate sections across your jurisdiction.
UpCodes Premium
Leverage the most sophisticated code compliance platform.
TRY FREE FOR TWO WEEKS VISIT PRICING
Join the waitlist
We are looking to gauge the level of interest in linking UL product and system certification information alongside related code sections.

Let us know your email and we’ll ping you once it’s ready! Learn more.

Thank you for your interest!

If you’re open to it, we would love to jump on the phone to make sure we’re building this in the best way possible for your workflow. Any insight or advice would be greatly appreciated. We’ve sent you an email with a calendar link to book at time with us.


Cancel
Get Early Access
UpCodes Premium
Leverage the full code compliance platform.
START 2 WEEK FREE TRIAL LEARN MORE