• Codes
  • Features

    Features Overview

    Go to features
    Reference

    Reference.

    A reliable and up-to-date source of codes.
    Research

    Research.

    Rapidly and efficiently calculate project parameters.
    Collaboration

    Collaboration.

    Get everyone on the same page and streamline code research.
    Workflows
    Architects General Contractor Building Official & Plans Examiner Inspectors Owner Subcontractors Code Consultants
  • Pricing
  • Login
  • Sign Up
Sign Up
Login
  • Code Library
  • Features
  • Pricing
  • About
  • Careers
  • Help
  • Contact
  • Terms
  • Privacy
Sign Up
Upgrade to Premium
Code calculators: Code Calculators automatically generates a detailed list of requirements.
REFERENCE
Amendment Styling
Industry-leading search
Suggested code sections
Code diagrams
RESEARCH
Code calculators
Filter by topic
Code compare
Code sheet exports
COLLABORATION
Team projects
Bookmarks
Comments
START 2 WEEK FREE TRIAL
Have an account? Sign in
// CODE SNIPPET

§28-118.4 Applications for Certificates of Occupancy

NYC General Admin. Provisions 2014 > 1 Administration > 118 Certificates of Occupancy > §28-118.4 Applications for Certificates of Occupancy
JUMP TO FULL CODE CHAPTER
All applications for certificates of occupancy shall be submitted on forms furnished by the department. Applications for new buildings or additions to buildings shall be accompanied by an accurate and complete final lot survey made by a land surveyor showing such information as prescribed by the commissioner. The commissioner may waive the requirement of such survey in the case of small sheds, stands, temporary structures, signs, and similar small structures.

§28-118.4.1 Applicant

The application for a certificate of occupancy shall be made by or on behalf of the owner of the building or open lot; and if made by a person other than the owner, the application shall be accompanied by a signed statement of the applicant stating that the applicant is authorized by the owner to make the application. The full names and addresses of the owner, and applicant, and of the principal officers thereof, if a corporation, shall be stated in the application.

§28-118.4.2 Statement of Compliance

When a certificate of occupancy for a new or altered building is applied for, the application shall be accompanied by a signed statement of the registered design professional of record or the superintendent of construction, as applicable, stating that such person has examined the approved construction documents and specifications of the building for which the certificate of occupancy is sought, and that, to the best of his or her knowledge and belief, the building has been erected or altered in accordance with the approved construction documents and specifications and, as erected or altered, complies with the provisions of this code and all other applicable laws and rules, except insofar as variations or variances therefrom have been legally permitted or authorized, specifying such variations or variances in such required statement.

Related Code Sections


§28-118.3.4.1 Administration, Application for Certificate of Occupancy
Upon application by the owner of such a building or open lot in existence prior to January 1, 1938, the commissioner shall issue a certificate ...
NYC General Admin. Provisions 2014 > 1 Administration > 118 Certificates of Occupancy > §28-118.3 Completed Buildings or Open Lots > §28-118.3.4 Existing Buildings or Open Lots Without Certificates of Occupancy > §28-118.3.4.1 Application for Certificate of Occupancy
§28-118.3.4.1 Administration, Application for Certificate of Occupancy
Upon application by the owner of such a building or open lot in existence prior to January 1, 1938, the commissioner shall issue a certificate ...
NYC General Admin. Provisions 2008 > 1 Administration > 118 Certificates of Occupancy > §28-118.3 Completed Buildings or Open Lots > §28-118.3.4 Existing Buildings or Open Lots Without Certificates of Occupancy > §28-118.3.4.1 Application for Certificate of Occupancy
§28-118.4.1 Administration, Applicant
The application for a certificate of occupancy shall be made by or on behalf of the owner of the building or open lot; and if made by a person other ...
NYC General Admin. Provisions 2008 > 1 Administration > 118 Certificates of Occupancy > §28-118.4 Applications for Certificates of Occupancy > §28-118.4.1 Applicant
§28-118.4.2 Administration, Statement of Compliance
When a certificate of occupancy for a new or altered building is applied for, the application shall be accompanied by a signed statement ...
NYC General Admin. Provisions 2014 > 1 Administration > 118 Certificates of Occupancy > §28-118.4 Applications for Certificates of Occupancy > §28-118.4.2 Statement of Compliance
§28-118.4.2 Administration, Statement of Compliance
When a certificate of occupancy for a new or altered building is applied for, the application shall be accompanied by a signed statement ...
NYC General Admin. Provisions 2008 > 1 Administration > 118 Certificates of Occupancy > §28-118.4 Applications for Certificates of Occupancy > §28-118.4.2 Statement of Compliance
Help Contact Us Privacy Terms
Code Compare
Code Compare
Highlight differences between any two building codes.
Code diagrams
Code diagrams
Unpack the code through illustrations and descriptions.
Code Calculators
Code Calculators
Code calculators automatically generate a detailed list of requirements.
Search
Search
Don't miss relevant code. Quickly locate sections across your jurisdiction.
Code sheet exports
Code sheet exports
Generate a code sheet that integrates with your drawing set.
Shared projects
Shared projects
Projects provide a dedicated space to collaborate on code research.
UpCodes Premium
Leverage the most sophisticated code compliance platform.
TRY FREE FOR TWO WEEKS VISIT PRICING
UpCodes Premium
Leverage the full code compliance platform.
START 2 WEEK FREE TRIAL LEARN MORE