7-113 Application for Plan, Report or Seismic Compliance Extension Review
Go To Full Code Chapter
- Except as otherwise provided in this part, before commencing construction or alteration of any health facility, the governing board or authority thereof shall submit an application for plan review to the Office, and shall obtain the written approval thereof by the Office describing the scope of work included and any special conditions under which approval is given.
- The application shall contain a definite identifying name for the health facility, the name of the architect or engineer who is in responsible charge of the work, pursuant to Section 7-115 (a), the names of the delegated architects or engineers responsible for the preparation of portions of the work pursuant to Section 7-115(a)3, the estimated cost of the project and all such other information required for completion of the application. The architect or engineer in responsible charge or having delegated responsibility may name one or more persons to act as an alternate(s), provided such persons are architects or engineers qualified under these regulations to assume the responsibility assigned.
- Submission of documents to the Office may be in three consecutive stages:
- Geotechnical Review: One application for plan review and, when applicable, three copies of the site data must be attached. Plans may be submitted electronically in a format acceptable to the Office.
- Preliminary Review: Submit drawings electronically or provide two paper copies of reports or preliminary plans and preliminary annotated specifications. If providing paper copies, plans/ drawings size shall not exceed 36 × 48 inches, and bundled sets of plans/drawings shall not exceed 40 lbs in weight. Plans may be submitted electronically in a format acceptable to the Office.
- Final Review: Submit drawings electronically or provide two paper copies of final construction documents and reports. If providing paper copies, plans/drawings size shall not exceed 36 × 48 inches, and bundled sets of plans/drawings shall not exceed 40 lbs in weight. Plans may be submitted electronically in a format acceptable to the Office.
- Application for seismic compliance extension requires submission of OSHPD Application Form #OSH-FD-384, "Application for 2008 Extension/Delay in Compliance." The submittal must comply with the applicable requirements of Chapter 6, Article 1, Section 1.5.2 "Delay in Compliance."
- For every project there shall be an architect or engineer in responsible charge of reviewing and coordinating all submittals, except as set forth in Section 7-115(c).
- A project may be divided into parts, provided that each part is clearly defined by a building or similar distinct unit. The part, so defined, shall include all portions and utility systems or facilities necessary to the complete functioning of that part. Separate assignments of the delegated architects or engineers pursuant to Section 7-115(a)3 may be made for the parts. Incremental projects pursuant to Section 7-131 shall consist of only one building.
- The assignment of the delegated architect or engineer pursuant to Section 7-115 (a) 3 and the responsibility for the preparation of construction documents and the administration of the work of construction for portions of the work shall be clearly designated on the application for approval of reports or construction documents.
Authority: Health and Safety Code Sections 18929 and 129675—130070.
Reference: Health and Safety Code Section 129850.
- (OSHPD 2/95) Regular order by the Office of Statewide Health Planning and Development to amend Section 7-113. Filed with the secretary of state on August 14, 1996, becomes effective September 13, 1996. Approved by the California Building Standards Commission on March 19, 1996.
Upcodes Diagrams
Related Code Sections
7-113 Safety Standards for Health Facilities, Application for Plan, Report or Seismic Compliance Extension Review
for seismic compliance extension requires submission of OSHPD Application Form #OSH-FD-384, "Application for 2008 Extension/Delay in Compliance." The ...
7-113 Safety Standards for Health Facilities, Application for Plan, Report or Seismic Compliance Extension Review
for seismic compliance extension requires submission of OSHPD Application Form #OSH-FD-384, "Application for 2008 Extension/Delay in Compliance." The ...
7-113 Safety Standards for Health Facilities, Application for Plan, Report or Seismic Compliance Extension Review
of plans/ drawings shall not exceed 40 lbs in weight. (b) Application for seismic compliance extension requires submission of OSHPD Application Form #OSH ...
1.3.1 Seismic Evaluation Procedures for Hospital Buildings, Seismic Evaluation Submittal
-113, "Application for Plan Report or Seismic Compliance Extension Review" and Section 7-133, "Fees" of Article 3, Chapter 7, Part 1, Title 24 ...
1.3.1 Seismic Evaluation Procedures for Hospital Buildings, Seismic Evaluation Submittal
-113, "Application for Plan Report or Seismic Compliance Extension Review" and Section 7-133, "Fees" of Article 3, Chapter 7, Part 1, Title 24 ...