// CODE SNIPPET
§28-105.5.1 Applicant for Permit
JUMP TO FULL CODE CHAPTER
The applicant for a permit shall be the person who performs the work or who retains a subcontractor to do the work.
Exception: For permits issued for plumbing work, fire protection and suppression work, and oil burner/boiler work, the applicant for such permits shall be the licensed master plumber, licensed master fire suppression piping contractor, or licensed oil-burning equipment installer, respectively, who performs the work.
Exception: For permits issued for plumbing work, fire protection and suppression work, and oil burner/boiler work, the applicant for such permits shall be the licensed master plumber, licensed master fire suppression piping contractor, or licensed oil-burning equipment installer, respectively, who performs the work.
Related Code Sections
*§28-103.11 Administration, Applications and Permits
The department shall receive and review applications, construction documents, and other related documents and shall issue permits, in accordance ...
NYC General Admin. Provisions 2014 > 1 Administration > 103 Duties and Powers of Commissioner of Buildings > *§28-103.11 Applications and Permits
*§28-105.5 Administration, Application for Permit
All applications for permits shall be submitted on forms furnished by the department. Applications shall include all information required ...
NYC General Admin. Provisions 2014 > 1 Administration > 105 Permits > *§28-105.5 Application for Permit
§28-103.11 Administration, Applications and Permits
The department shall receive and review applications, construction documents, and other submittal documents and shall issue permits, in accordance ...
NYC General Admin. Provisions 2008 > 1 Administration > 103 Duties and Powers of Commissioner of Buildings > §28-103.11 Applications and Permits
§28-105.5 Administration, Application for Permit
All applications for permits shall be submitted on forms furnished by the department. Applications shall include all information required ...
NYC General Admin. Provisions 2008 > 1 Administration > 105 Permits > §28-105.5 Application for Permit
3314.16.3 Safeguards During Construction or Demolition, Permit Application
The following equipment information shall be submitted by an engineer with the permit application for corner and angle scaffolds: Plans and details ...
NYC Building Code 2008 > 33 Safeguards During Construction or Demolition > 3314 Scaffolds > 3314.16 Corner and Angle Scaffolds > 3314.16.3 Permit Application