// CODE SNIPPET
**§28-317.5 Annual Certification
JUMP TO FULL CODE CHAPTER
The owner or operator of a cooling tower shall file an annual certification that such cooling tower was inspected, tested, cleaned and disinfected in compliance with section 17-194.1 of the administrative code and the rules of the department of health and mental hygiene, and that a maintenance program and plan has been developed and implemented as required by such section. Such certification shall be submitted by November 1, 2016 and by November 1 of each year thereafter, or by a date otherwise specified in the rules of the department. The department of health and mental hygiene shall send an electronic reminder to each owner or operator of a cooling tower at least 30 days before such certification submission deadline. Such electronic reminder shall include a link to the website where such certification may be submitted.
**Section 28-317.7 was added by: Local Law 77 of 2015. This law has an effective date of August 18, 2015.
Section 28-317.7 was amended by: Local Law 76 of 2019. This law has an effective date of October 25, 2019.
**Section 28-317.7 was added by: Local Law 77 of 2015. This law has an effective date of August 18, 2015.
Section 28-317.7 was amended by: Local Law 76 of 2019. This law has an effective date of October 25, 2019.
Related Code Sections
**§28-317.5 Maintenance of Buildings, Annual Certification
The owner or operator of a cooling tower shall file an annual certification that such cooling tower was inspected, tested, cleaned and disinfected ...
NYC General Admin. Provisions 2014 > 3 Maintenance of Buildings > *317 Cooling Towers > **§28-317.5 Annual Certification
§28-112.7.1 Administration, Fees for the Testing, Approval, Inspection and Use of Power-Operated Cranes, Derricks and Cableways
than two hundred feet in length; fee also includes initial certificate of operation. $500 $250 annually The boom length as herein specified shall ...
NYC General Admin. Provisions 2014 > 1 Administration > 112 Fees > §28-112.7 Inspection and Report Filing Fees > §28-112.7.1 Fees for the Testing, Approval, Inspection and Use of Power-Operated Cranes, Derricks and Cableways
§28-112.7.1 Administration, Fees for the Testing, Approval, Inspection and Use of Power-Operated Cranes, Derricks and Cableways
includes initial certificate of operation.
$500
$250 annually
The boom length as herein specified shall include the jibs and any ...
NYC General Admin. Provisions 2008 > 1 Administration > 112 Fees > §28-112.7 Inspection Fees > §28-112.7.1 Fees for the Testing, Approval, Inspection and Use of Power-Operated Cranes, Derricks and Cableways
§28-117.3 Administration, Duration of Certificate
, such certificate shall be effective only for periods of time during which there is in effect an annual place of assembly permit issued by the fire ...
NYC General Admin. Provisions 2014 > 1 Administration > 117 Places of Assembly > §28-117.3 Duration of Certificate
*§28-117.3 Administration, Duration of Certificate
, such certificate shall be effective only for periods of time during which there is in effect an annual place of assembly permit issued by the fire ...
NYC General Admin. Provisions 2008 > 1 Administration > 117 Places of Assembly > *§28-117.3 Duration of Certificate