• Codes
  • Features

    Features Overview

    Go to features
    Reference

    Reference.

    A reliable and up-to-date source of codes.
    Research

    Research.

    Rapidly and efficiently calculate project parameters.
    Collaboration

    Collaboration.

    Get everyone on the same page and streamline code research.
    Workflows
    Architects General Contractor Building Official & Plans Examiner Inspectors Owner Subcontractors Code Consultants
  • Pricing
  • Login
  • Sign Up
Sign Up
Login
  • Code Library
  • Features
  • Pricing
  • About
  • Careers
  • Help
  • Contact
  • Terms
  • Privacy
Sign Up
Upgrade to Premium
Code calculators: Code Calculators automatically generates a detailed list of requirements.
REFERENCE
Amendment Styling
Industry-leading search
Suggested code sections
Code diagrams
RESEARCH
Code calculators
Filter by topic
Code compare
Code sheet exports
COLLABORATION
Team projects
Bookmarks
Comments
START 2 WEEK FREE TRIAL
Have an account? Sign in
// CODE SNIPPET

3103.9 Anchorage Required

Fire Code 2015 of Alabama > 31 Tents and Other Membrane Structures > 3103 Temporary Tents and Membrane Structures > 3103.9 Anchorage Required
JUMP TO FULL CODE CHAPTER
Tents or membrane structures and their appurtenances shall be adequately roped, braced and anchored to withstand the elements of weather and prevent against collapsing. Documentation of structural stability shall be furnished to the fire code official on request.

3103.9.1 Tents and Membrane Structures Exceeding One Story

Tents and membrane structures exceeding one story shall be designed and constructed to comply with Chapter 16 of the International Building Code.

Related Code Sections


2403.9 Tents and Other Membrane Structures, Anchorage Required
Tents or membrane structures and their appurtenances shall be adequately roped, braced and anchored to withstand the elements of weather and prevent ...
Fire Code 2009 of Alabama > 24 Tents and Other Membrane Structures > 2403 Temporary Tents and Membrane Structures > 2403.9 Anchorage Required
3103.9 Tents and Other Membrane Structures, Anchorage Required
Tents or membrane structures and their appurtenances shall be adequately roped, braced and anchored to withstand the elements of weather and prevent ...
Fire Code 2015 of Alabama > 31 Tents and Other Membrane Structures > 3103 Temporary Tents and Membrane Structures > 3103.9 Anchorage Required
R606.11 Wall Construction, Anchorage
R606.11(1) ANCHORAGE REQUIREMENTS FOR MASONRY WALLS LOCATED IN SEISMIC DESIGN CATEGORY A, B OR C AND WHERE WIND LOADS ARE LESS THAN 30 PSF ...
Residential Code 2015 of Alabama > 6 Wall Construction > R606 General Masonry Construction > R606.11 Anchorage
1604.8.2 Structural Design, Structural Walls
for walls of structures assigned to all other seismic design categories . Required anchors in masonry walls of hollow units or cavity walls shall ...
Building Code 2015 of Alabama > 16 Structural Design > 1604 General Design Requirements > 1604.8 Anchorage > 1604.8.2 Structural Walls
1604.8.1 Structural Design, General
Anchorage of the roof to walls and columns, and of walls and columns to foundations, shall be provided to resist the uplift and sliding forces ...
Building Code 2009 of Alabama > 16 Structural Design > 1604 General Design Requirements > 1604.8 Anchorage > 1604.8.1 General
Help Contact Us Privacy Terms
View thousands of relevant UL Certified products and assemblies that help achieve code compliance
View thousands of relevant UL Certified products and assemblies that help achieve code compliance
Access to UL product and system certification information.
Code sheet exports
Code sheet exports
Generate a code sheet that integrates with your drawing set.
Search
Search
Don't miss relevant code. Quickly locate sections across your jurisdiction.
Shared projects
Shared projects
Projects provide a dedicated space to collaborate on code research.
Code diagrams
Code diagrams
Unpack the code through illustrations and descriptions.
Code Calculators
Code Calculators
Code calculators automatically generate a detailed list of requirements.
Code Compare
Code Compare
Highlight differences between any two building codes.
UpCodes Premium
Leverage the most sophisticated code compliance platform.
TRY FREE FOR TWO WEEKS VISIT PRICING
Join the waitlist
We are looking to gauge the level of interest in linking UL product and system certification information alongside related code sections.

Let us know your email and we’ll ping you once it’s ready! Learn more.

Thank you for your interest!

If you’re open to it, we would love to jump on the phone to make sure we’re building this in the best way possible for your workflow. Any insight or advice would be greatly appreciated. We’ve sent you an email with a calendar link to book at time with us.


Cancel
Get Early Access
UpCodes Premium
Leverage the full code compliance platform.
START 2 WEEK FREE TRIAL LEARN MORE