// CODE SNIPPET
C102 Alternate Materials and Methods
Go To Full Code Chapter
The provisions of this standard are not intended to prevent the use of any material or method of construction not specifically prescribed by this standard, provided any such alternate is demonstrated according to the provisions of Chapter C3 of this standard, to be effective at the control of radon.
Upcodes Diagrams
Related Code Sections
C102 Florida Standard for Mitigation of Radon in Existing Buildings, Alternate Materials and Methods
The provisions of this standard are not intended to prevent the use of any material or method of construction not specifically prescribed ...
C102 Florida Standard for Mitigation of Radon in Existing Buildings, Alternate Materials and Methods
The provisions of this standard are not intended to prevent the use of any material or method of construction not specifically prescribed ...
E102 Florida Standard for Mitigation of Radon in Existing Buildings Effective: June 1, 1994, Alternate Materials and Methods
The provisions of this standard are not intended to prevent the use of any material or method of construction not specifically prescribed ...
454.2.5 Special Detailed Requirements Based on Use and Occupancy, Alternate Materials and Methods of Construction
The provisions of this code are not intended to prevent the use of any alternate material, method of construction, appliance or equipment, provided ...
454.2.5 Special Detailed Requirements Based on Use and Occupancy, Alternate Materials and Methods of Construction
The provisions of this code are not intended to prevent the use of any alternate material, method of construction, appliance or equipment, provided ...