• Codes
  • Features

    Features Overview

    Go to features
    Reference

    Reference.

    A reliable and up-to-date source of codes.
    Research

    Research.

    Rapidly and efficiently calculate project parameters.
    Collaboration

    Collaboration.

    Get everyone on the same page and streamline code research.
    Workflows
    Architects
    Architects
    General Contractors
    General Contractors
    Building Official & Plans Examiners
    Building Official & Plans Examiners
    Inspectors
    Inspectors
    Owners
    Owners
    Subcontractors
    Subcontractors
    Code Consultants
    Code Consultants
  • Pricing
  • Login
  • Sign Up
Sign Up
Login
  • Code Library
  • Features
  • Pricing
  • About
  • Careers
  • Help
  • Contact
  • Terms
  • Privacy
Sign Up
Upgrade to Premium
Code calculators: Code Calculators automatically generates a detailed list of requirements.
REFERENCE
Amendment Styling
Industry-leading search
Code diagrams
RESEARCH
Code calculators
Filter by topic
Code compare
Code sheet exports
COLLABORATION
Team projects
Bookmarks
Comments
START 2 WEEK FREE TRIAL
Have an account? Sign in
// CODE SNIPPET

403.4 Alluvial and Colluvial Deposits

Private Sewage Disposal Code 2018 of South Holland > 4 Site Evaluation and Requirements > 403 Soil Borings and Evaluation > 403.4 Alluvial and Colluvial Deposits
JUMP TO FULL CODE CHAPTER
Subsurface soil absorption systems shall not be placed in alluvial and colluvial deposits with shallow depths, extended periods of saturation or possible flooding.

Related Code Sections


403.4 Site Evaluation and Requirements, Alluvial and Colluvial Deposits
Subsurface soil absorption systems shall not be placed in alluvial and colluvial deposits with shallow depths, extended periods of saturation ...
Private Sewage Disposal Code 2018 of South Holland > 4 Site Evaluation and Requirements > 403 Soil Borings and Evaluation > 403.4 Alluvial and Colluvial Deposits
403.4 Site Evaluation and Requirements, Alluvial and Colluvial Deposits
Subsurface soil absorption systems shall not be placed in alluvial and colluvial deposits with shallow depths, extended periods of saturation ...
Private Sewage Disposal Code 2012 of South Holland > 4 Site Evaluation and Requirements > 403 Soil Borings and Evaluation > 403.4 Alluvial and Colluvial Deposits
2403.2.1.2 Flammable Finishes, Areas Subject to Deposits of Residues
for locations containing deposits of readily ignitable residue and explosive vapors. Exceptions: This provision shall not apply to wiring ...
Fire Code 2012 of South Holland > 24 Flammable Finishes > 2403 Protection of Operations > 2403.2 Sources of Ignition > 2403.2.1 Electrical Wiring and Equipment > 2403.2.1.2 Areas Subject to Deposits of Residues
2403.2.1.2 Flammable Finishes, Areas Subject to Deposits of Residues
for locations containing deposits of readily ignitable residue and explosive vapors. Exceptions: This provision shall not apply to wiring ...
Fire Code 2018 of South Holland > 24 Flammable Finishes > 2403 Protection of Operations > 2403.2 Sources of Ignition > 2403.2.1 Electrical Wiring and Equipment > 2403.2.1.2 Areas Subject to Deposits of Residues
403.2.1 Site Evaluation and Requirements, Other Soil Color Patterns
are soil mottles formed from residual sandstone deposits; soil mottles formed from uneven weathering of glacially deposited material or glacially ...
Private Sewage Disposal Code 2012 of South Holland > 4 Site Evaluation and Requirements > 403 Soil Borings and Evaluation > 403.2 Color Patterns Not Indicative of Soil Saturation > 403.2.1 Other Soil Color Patterns
Help Contact Us Privacy Terms
Code Compare
Code Compare
Highlight differences between any two building codes.
Code sheet exports
Code sheet exports
Generate a code sheet that integrates with your drawing set.
Search
Search
Don't miss relevant code. Quickly locate sections across your jurisdiction.
Code Calculators
Code Calculators
Code calculators automatically generate a detailed list of requirements.
Code diagrams
Code diagrams
Unpack the code through illustrations and descriptions.
Shared projects
Shared projects
Projects provide a dedicated space to collaborate on code research.
UpCodes Premium
Leverage the most sophisticated code compliance platform.
VISIT PRICING
UpCodes Premium
Leverage the full code compliance platform.
START 2 WEEK FREE TRIAL PRICING