• Codes
  • Features

    Features Overview

    Go to features
    Reference

    Reference.

    A reliable and up-to-date source of codes.
    Research

    Research.

    Rapidly and efficiently calculate project parameters.
    Collaboration

    Collaboration.

    Get everyone on the same page and streamline code research.
    Workflows
    Architects General Contractor Building Official & Plans Examiner Inspectors Owner Subcontractors Code Consultants
  • Pricing
  • Login
  • Sign Up
Sign Up
Login
  • Code Library
  • Features
  • Pricing
  • About
  • Careers
  • Help
  • Contact
  • Terms
  • Privacy
Sign Up
Upgrade to Premium
Code calculators: Code Calculators automatically generates a detailed list of requirements.
REFERENCE
Amendment Styling
Industry-leading search
Suggested code sections
Code diagrams
RESEARCH
Code calculators
Filter by topic
Code compare
Code sheet exports
COLLABORATION
Team projects
Bookmarks
Comments
START 2 WEEK FREE TRIAL
Have an account? Sign in
// CODE SNIPPET

2903.11 Alarm System

California Fire Code 2019 > 29 Manufacture of Organic Coatings > 2903 General Precautions > 2903.11 Alarm System
JUMP TO FULL CODE CHAPTER
An approved fire alarm system shall be provided in accordance with Section 907.

Related Code Sections


2903.11 Manufacture of Organic Coatings, Alarm System
An approved fire alarm system shall be provided in accordance with Section 907 ...
California Fire Code 2016 > 29 Manufacture of Organic Coatings > 2903 General Precautions > 2903.11 Alarm System
2903.11 Manufacture of Organic Coatings, Alarm System
An approved fire alarm system shall be provided in accordance with Section 907 ...
California Fire Code 2019 > 29 Manufacture of Organic Coatings > 2903 General Precautions > 2903.11 Alarm System
418.5 Ventilation Air, Alarm Systems
An Audible and visual alarm system shall be installed to alert sterilizer operating personnel if the air flow falls below design cubic feet per ...
California Mechanical Code 2016 > 4 Ventilation Air > 418.0 Design Requirements for Ethylene Oxide (Eto) Sterilization Areas > 418.5 Alarm Systems
418.5 Ventilation Air, Alarm Systems
An Audible and visual alarm system shall be installed to alert sterilizer operating personnel if the airflow falls below design cubic feet per minute ...
California Mechanical Code 2019 > 4 Ventilation Air > 418.0 Design Requirements for Ethylene Oxide (Eto) Sterilization Areas > 418.5 Alarm Systems
1103.7 Construction Requirements for Existing Buildings, Fire Alarm Systems
An approved fire alarm system shall be installed in existing buildings and structures in accordance with Sections 1103.7.1 through 1103.7.7 ...
California Fire Code 2016 > 11 Construction Requirements for Existing Buildings > 1103 Fire Safety Requirements for Existing Buildings > 1103.7 Fire Alarm Systems
Help Contact Us Privacy Terms
View thousands of relevant UL Certified products and assemblies that help achieve code compliance
View thousands of relevant UL Certified products and assemblies that help achieve code compliance
Access to UL product and system certification information.
Code sheet exports
Code sheet exports
Generate a code sheet that integrates with your drawing set.
Code Compare
Code Compare
Highlight differences between any two building codes.
Search
Search
Don't miss relevant code. Quickly locate sections across your jurisdiction.
Code diagrams
Code diagrams
Unpack the code through illustrations and descriptions.
Shared projects
Shared projects
Projects provide a dedicated space to collaborate on code research.
Code Calculators
Code Calculators
Code calculators automatically generate a detailed list of requirements.
UpCodes Premium
Leverage the most sophisticated code compliance platform.
TRY FREE FOR TWO WEEKS VISIT PRICING
Join the waitlist
We are looking to gauge the level of interest in linking UL product and system certification information alongside related code sections.

Let us know your email and we’ll ping you once it’s ready! Learn more.

Thank you for your interest!

If you’re open to it, we would love to jump on the phone to make sure we’re building this in the best way possible for your workflow. Any insight or advice would be greatly appreciated. We’ve sent you an email with a calendar link to book at time with us.


Cancel
Get Early Access
UpCodes Premium
Leverage the full code compliance platform.
START 2 WEEK FREE TRIAL LEARN MORE