UpCodes logo
Go To Full Code Chapter
Penetrations of the air barrier and paths of air leakage shall be caulked, gasketed or otherwise sealed in a manner compatible with the construction materials and location. Joints and seals shall be sealed in the same manner or taped or covered with a moisture vapor-permeable wrapping material. Sealing materials shall be appropriate to the construction materials being sealed. The joints and seals shall be securely installed in or on the joint for its entire length so as not to dislodge, loosen or otherwise impair its ability to resist positive and negative pressure from wind, stack effect and mechanical ventilation.
Upcodes Diagrams

Related Code Sections

C402.4.2 [CE] Commercial Energy Efficiency, Air Barrier Penetrations
Penetrations of the air barrier and paths of air leakage shall be caulked, gasketed or otherwise sealed in a manner compatible with the construction ...
6.7.3 Systems and Equipment, Smoke Barriers
Where smoke barriers are required, heating, ventilating, and air-conditioning zones shall be coordinated with compartmentation to minimize ductwork ...
6.7.3 Systems and Equipment, Smoke Barriers
Where smoke barriers are required, heating, ventilating, and air-conditioning zones shall be coordinated with compartmentation to minimize ductwork ...