• Codes
  • Features

    Features Overview

    Go to features
    Reference

    Reference.

    A reliable and up-to-date source of codes.
    Research

    Research.

    Rapidly and efficiently calculate project parameters.
    Collaboration

    Collaboration.

    Get everyone on the same page and streamline code research.
    Workflows
    Architects General Contractor Building Official & Plans Examiner Inspectors Owner Subcontractors Code Consultants
  • Pricing
  • Login
  • Sign Up
Sign Up
Login
  • Code Library
  • Features
  • Pricing
  • About
  • Careers
  • Help
  • Contact
  • Terms
  • Privacy
Sign Up
Upgrade to Premium
Code calculators: Code Calculators automatically generates a detailed list of requirements.
REFERENCE
Amendment Styling
Industry-leading search
Code diagrams
RESEARCH
Code calculators
Filter by topic
Code compare
Code sheet exports
COLLABORATION
Team projects
Bookmarks
Comments
START 2 WEEK FREE TRIAL
Have an account? Sign in
// CODE SNIPPET

§28-303.7.1 Affirmation of Correction

NYC General Admin. Provisions 2014 > 3 Maintenance of Buildings > 303 Periodic Boiler Inspections > §28-303.7 Owner's Annual Boiler Inspection Report > §28-303.7.1 Affirmation of Correction
JUMP TO FULL CODE CHAPTER
The owner must file an affirmation that all defects identified in the annual boiler inspection report have been corrected. Such affirmation must be filed with the department within 120 days after the date of filing of the report.

Related Code Sections


§28-303.7.1 Maintenance of Buildings, Affirmation of Correction
The owner must file an affirmation that all defects identified in the annual boiler inspection report have been corrected. Such affirmation must ...
NYC General Admin. Provisions 2014 > 3 Maintenance of Buildings > 303 Periodic Boiler Inspections > §28-303.7 Owner's Annual Boiler Inspection Report > §28-303.7.1 Affirmation of Correction
§28-304.6.6 Maintenance of Buildings, Repair
hazardous conditions shall be corrected immediately. An affirmation of correction shall be filed within 60 days of the date of correction ...
NYC General Admin. Provisions 2014 > 3 Maintenance of Buildings > 304 Elevators and Conveying Systems > §28-304.6 Inspection and Testing Process > §28-304.6.6 Repair
*§28-304.6.6 Maintenance of Buildings, Repair
hazardous conditions shall be corrected immediately. An affirmation of correction shall be filed within 60 days of the date of correction ...
NYC General Admin. Provisions 2008 > 3 Maintenance of Buildings > 304 Periodic Inspection of Elevators > §28-304.6 Inspection and Testing Process > *§28-304.6.6 Repair
§28-214.2 Enforcement, Access to Sealed Premises
upon the following conditions: The submission of a written affirmation, satisfactory to the commissioner, that such person or persons will commence ...
NYC General Admin. Provisions 2014 > 2 Enforcement > 214 Order to Seal, Secure and Close > §28-214.2 Access to Sealed Premises
§28-214.2 Enforcement, Access to Sealed Premises
upon the following conditions:   1. The submission of a written affirmation, satisfactory to the commissioner, that such person ...
NYC General Admin. Provisions 2008 > 2 Enforcement > 214 Order to Seal, Secure and Close > §28-214.2 Access to Sealed Premises
Help Contact Us Privacy Terms
Shared projects
Shared projects
Projects provide a dedicated space to collaborate on code research.
Code diagrams
Code diagrams
Unpack the code through illustrations and descriptions.
Code Calculators
Code Calculators
Code calculators automatically generate a detailed list of requirements.
Code sheet exports
Code sheet exports
Generate a code sheet that integrates with your drawing set.
Search
Search
Don't miss relevant code. Quickly locate sections across your jurisdiction.
Code Compare
Code Compare
Highlight differences between any two building codes.
UpCodes Premium
Leverage the most sophisticated code compliance platform.
TRY FREE FOR TWO WEEKS VISIT PRICING
UpCodes Premium
Leverage the full code compliance platform.
START 2 WEEK FREE TRIAL LEARN MORE