• Codes
  • Features

    Features Overview

    Go to features
    Reference

    Reference.

    A reliable and up-to-date source of codes.
    Research

    Research.

    Rapidly and efficiently calculate project parameters.
    Collaboration

    Collaboration.

    Get everyone on the same page and streamline code research.
    Workflows
    Architects General Contractor Building Official & Plans Examiner Inspectors Owner Subcontractors Code Consultants
  • Pricing
  • Login
  • Sign Up
Sign Up
Login
  • Code Library
  • Features
  • Pricing
  • About
  • Careers
  • Help
  • Contact
  • Terms
  • Privacy
Sign Up
Upgrade to Premium
Code calculators: Code Calculators automatically generates a detailed list of requirements.
REFERENCE
Amendment Styling
Industry-leading search
Suggested code sections
Code diagrams
RESEARCH
Code calculators
Filter by topic
Code compare
Code sheet exports
COLLABORATION
Team projects
Bookmarks
Comments
START 2 WEEK FREE TRIAL
Have an account? Sign in
// CODE SNIPPET

3102F.3.9 Action Plan Implementation Between Audits

Los Angeles Building Code > 31F [SLC] Marine Oil Terminals > 3102F Audit and Inspection > 3102F.3 Audits > 3102F.3.9 Action Plan Implementation Between Audits
JUMP TO FULL CODE CHAPTER

The operator is responsible for correction of deficiencies between audits. Prior to implementation, projects shall be submitted for Division review in accordance with Section 3101F.8.3. During project implementation, the Division shall be informed of any significant changes. After project completion, "as-built" documentation, including drawings, calculations and analyses, shall be submitted to the Division.

Executive Summary Tables shall be updated by the operator and submitted to the Division at least annually.

Related Code Sections


3102F.3.9 [SLC] Marine Oil Terminals, Action Plan Implementation Between Audits
The operator is responsible for correction of deficiencies between audits. Prior to implementation, projects shall be submitted for Division review ...
Los Angeles Building Code > 31F [SLC] Marine Oil Terminals > 3102F Audit and Inspection > 3102F.3 Audits > 3102F.3.9 Action Plan Implementation Between Audits
3102F.4.1 [SLC] Marine Oil Terminals, Notification and Action Plan
-event inspection is required, an action plan shall be submitted to the Division within five (5) days after the event. This deadline may be extended ...
Los Angeles Building Code > 31F [SLC] Marine Oil Terminals > 3102F Audit and Inspection > 3102F.4 Post-Event Inspection > 3102F.4.1 Notification and Action Plan
3102F.4.7 [SLC] Marine Oil Terminals, Action Plan Report
Upon completion of all actions delineated in the action plan, a final report shall be submitted to the Division to document the work completed ...
Los Angeles Building Code > 31F [SLC] Marine Oil Terminals > 3102F Audit and Inspection > 3102F.4 Post-Event Inspection > 3102F.4.7 Action Plan Report
3102F.1 [SLC] Marine Oil Terminals, General
been completed. Indicates that the structure is ready to have repair plans prepared and implemented. No Action Specified when no further action ...
Los Angeles Building Code > 31F [SLC] Marine Oil Terminals > 3102F Audit and Inspection > 3102F.1 General
3102F.3.2 [SLC] Marine Oil Terminals, Overview
The audit shall include above water and underwater inspections, and structural, electrical and mechanical systems evaluations, with supporting ...
Los Angeles Building Code > 31F [SLC] Marine Oil Terminals > 3102F Audit and Inspection > 3102F.3 Audits > 3102F.3.2 Overview
Help Contact Us Privacy Terms
Search
Search
Don't miss relevant code. Quickly locate sections across your jurisdiction.
Code diagrams
Code diagrams
Unpack the code through illustrations and descriptions.
Code Calculators
Code Calculators
Code calculators automatically generate a detailed list of requirements.
Code Compare
Code Compare
Highlight differences between any two building codes.
Code sheet exports
Code sheet exports
Generate a code sheet that integrates with your drawing set.
Shared projects
Shared projects
Projects provide a dedicated space to collaborate on code research.
UpCodes Premium
Leverage the most sophisticated code compliance platform.
TRY FREE FOR TWO WEEKS VISIT PRICING
UpCodes Premium
Leverage the full code compliance platform.
START 2 WEEK FREE TRIAL LEARN MORE