1910.102 Acetylene
Go To Full Code Chapter
1910.102(a) Cylinders
1910.102(b) Piped Systems
1910.102(b)(1)
Employers must comply with Chapter 9 ("Acetylene Piping") of NFPA 51A-2006 ("Standard for Acetylene Charging Plants") (National Fire Protection Association, 2006 ed., 2006).
1910.102(b)(2)
When employers can demonstrate that the facilities, equipment, structures, or installations used to generate acetylene or to charge (fill) acetylene cylinders were installed prior to February 16, 2006, these employers may comply with the provisions of Chapter 7 ("Acetylene Piping") of NFPA 51A-2001 ("Standard for Acetylene Charging Plants") (National Fire Protection Association, 2001 ed., 2001).
1910.102(b)(3)
The provisions of § 1910.102(b)(2) also apply when the facilities, equipment, structures, or installations used to generate acetylene or to charge (fill) acetylene cylinders were approved for construction or installation prior to February 16, 2006, but constructed and installed on or after that date.
1910.102(b)(4)
For additional information on acetylene piping systems, see CGA G-1.2-2006, Part 3 ("Acetylene piping") (Compressed Gas Association, Inc., 3rd ed., 2006).
1910.102(c) Generators and Filling Cylinders
1910.102(c)(1)
Employers must ensure that facilities, equipment, structures, or installations used to generate acetylene or to charge (fill) acetylene cylinders comply with the provisions of NFPA 51A-2006 ("Standard for Acetylene Charging Plants") (National Fire Protection Association, 2006 ed., 2006).
1910.102(c)(2)
When employers can demonstrate that the facilities, equipment, structures, or installations used to generate acetylene or to charge (fill) of acetylene cylinders were constructed or installed prior to February 16, 2006, these employers may comply with the provisions of NFPA 51A-2001 ("Standard for Acetylene Charging Plants") (National Fire Protection Association, 2001 ed., 2001).
1910.102(c)(3)
The provisions of § 1910.102(c)(2) also apply when the facilities, equipment, structures, or installations were approved for construction or installation prior to February 16, 2006, but constructed and installed on or after that date.
[61 FR 9236, March 7, 1996; 74 FR 40447, August 11, 2009; 76 FR 75786, Dec. 5, 2011]
[61 FR 9236, March 7, 1996; 74 FR 40447, August 11, 2009; 76 FR 75786, Dec. 5, 2011]
Upcodes Diagrams
Related Code Sections
1910.102 Hazardous Materials, Acetylene
Employers must ensure that the in-plant transfer, handling, storage, and use of acetylene in cylinders comply with the provisions of CGA Pamphlet G-1 ...
1910.253(f) Welding, Cutting, and Brazing, Acetylene Generators
Generators shall be of approved construction and shall be plainly marked with the maximum rate of acetylene in cubic feet per hour for which ...
1910.253(f)(5)(i)(A) Welding, Cutting, and Brazing,
All portable generators shall be of a type approved for portable use ...
1910.253(f)(5)(i)(B) Welding, Cutting, and Brazing,
Portable generators shall not be used within 10 feet (3 m) of combustible material other than the floor ...